Every stud. Every sheet. Counted.
Type the job. StudSheet draws it, counts every piece with the math shown, adds your prices, and turns it into an estimate your client signs on their phone. Built for contractors, free for homeowners.
Works in any browser today. No account needed for Sheets.
- Wall
- 12′ × 8′partition
- On center
- 16″stud spacing
- Studs
- 10on the layout
- Buy
- 11studs, 2×4 × 8′
- Plates
- 22×4 × 12′
- Drywall
- 74×8 sheets
See it in under a minute. Sketch to paid.
A frameless shower door, tapped through on a phone: the real app, a made-up client, the app’s own math.
- The sizes. A panel typed at 30-1/8″ × 76″ and a door; the panel’s bottom measured 30-1/4″, typed with Only this side.
- The prices. Glass by the square foot, hinges, a pull and the install, from the price book. The quantities come off the sketch.
- The estimate. Markup, labor and New Jersey sales tax: $2,242.33. The client signs on the phone.
- Paid. A 50% deposit invoiced and paid by Zelle, recorded in two taps.
From “how much do I need?” to “paid in full.”
StudSheet turns a job into numbers you can trust: what to buy, which tools, the steps in order, and what the code asks for in your state. Contractors run the whole job from it, from the takeoff to the last invoice; homeowners use the same Sheets for free.
- Contractors
- Takeoffs with the math shown, estimates at your own prices, client e-signature, change orders, invoices and payments
- Homeowners
- Type the job and get every piece counted, the tools, the steps, and an honest DIY or hire-a-pro call
- Crews
- Schedule, time on the job, receipts and job cost, with crew logins
- Your state
- Code notes and permits for where the job is, with typical US store prices
- Anywhere
- In your browser today; iPhone, iPad and Android apps on the way
One page. The whole job.
Answer the few questions that change the answer. You get a Sheet: the drawing, every material counted with the math shown, the tools to own, buy or rent, the order of work, the mistakes that ruin the job, and a stamp that says DIY or pro.
Sheet A-1 · Paint a room
14′ × 12′ room
- Paint
- 2.25gallons, all products
- Walls
- 365sq ft
- Coats
- 2finish
Tools you need
- 9″ roller frame
- Extension pole
- 2½″ angled sash brush
- 5-gal bucket + roller grid
- Step ladder (6 ft)
- Putty knife
14 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 2 gallons + 1 quart | Wall painteggshell, 2 coats | 365 sq ft of wall (416 minus 1 doors × 21 and 2 windows × 15) × 2 coats ÷ 350 sq ft/gal = 2.09 gal. |
| 1 roll | Painter’s tape 1.41″ × 60 yd | 148 ft to mask (the ceiling line, baseboards and casing) + 10%; 180 ft per roll. |
| 2 | Canvas drop cloth 9×129×12 canvas | Work one wall at a time and leapfrog them. |
| 1 pack | Plastic sheeting 9×12 | Cover furniture you can’t move out. |
| 1 tub | Lightweight spackle8 oz | Nail holes and dings. |
| 2 covers | Roller covers 9″⅜″ nap | ⅜″ nap for smooth walls — one per product, plus a spare. |
| 1 | Tray linersfits your tray | One per product. |
Sheet A-1 · Paint a room
4.27 m × 3.66 m room
- Paint
- 8.5litres, all products
- Walls
- 33.9m²
- Coats
- 2finish
Tools you need
- 230 mm roller frame
- Extension pole
- 63 mm angled sash brush
- 18.9 L bucket + roller grid
- Step ladder (1.8 m)
- Putty knife
14 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 2 × 3.78 L + 1 × 946 mL | Wall painteggshell, 2 coats | 33.9 m² of wall (38.6 minus 1 doors × 2.0 and 2 windows × 1.4) × 2 coats ÷ 32.5 m² per 3.78 L = 7.9 L. Cans are counted at 3.78 L — read the litres on the can (Canadian “gallon” cans hold 3.6–3.79 L). |
| 1 roll | Painter’s tape 36 mm × 55 m | 45.11 m to mask (the ceiling line, baseboards and casing) + 10%; 55 m per roll. |
| 2 | Canvas drop cloth 2.7 × 3.7 m2.7 × 3.7 m canvas | Work one wall at a time and leapfrog them. |
| 1 pack | Plastic sheeting 2.7 × 3.7 m | Cover furniture you can’t move out. |
| 1 tub | Lightweight spackle236 mL | Nail holes and dings. |
| 2 covers | Roller covers 230 mm10 mm nap | 10 mm nap for smooth walls — one per product, plus a spare. |
| 1 | Tray linersfits your tray | One per product. |
Sheet S-1 · Deck or balcony
16′ × 12′ deck
- Deck
- 192sq ft · 16′ × 12′
- Footings
- 319″ × 36″ deep
- Joists
- 132×8 at 16″ o.c.
- Beam
- 2-2×103 posts, 7′ apart
Tools you need
- Tape measure (25 ft)
- Mason's line + stakes
- Chalk line
- 4-ft level
- Speed square
- Framing square
29 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 17 bags | Concrete mix, 80 lb80 lb bags | 3 footings: a pad 19″ across × 6″ thick at 36″ deep, then a 12″ pier up to 2″ above the ground = 3.08 cu ft each, +10% = 10.16 cu ft; 80 lb bag ≈ 0.6 cu ft (Quikrete). |
| 3 tubes | Concrete form tube12″ × 4′ | One per pier, cut to 32″ (from the pad to 2″ above the ground). |
| 3 posts | Pressure-treated 6×6 post6×6 × 8′ | 3 posts, about 1′ 4-1/2″ from the pier to the beam: deck 3′ − decking − joist − beam − 2″ of pier. Cut each one to the string line, not to a number. |
| 3 bases | Post base or anchor6×6 standoff, galvanized | One per post: holds it on the pier and off the concrete (IRC R507.4.1). |
| 3 bolts | Anchor bolt ⅝″ with nut and washer⅝″, J-bolt or wedge anchor | One per post base, set in the wet concrete (or drilled in later) per the base’s label. |
| 3 caps | Post-to-beam connector (post cap)for 6×6 and a 2-ply beam | Ties the beam to each post (IRC R507.8). |
| 2 boards | Pressure-treated 2×102×10 × 16′ | Beam 2-2×10, 16′ long: 2 plies. Posts 7′ apart, 12″ in from each end; this beam spans up to 7′ 4″ with 10′ 9″ joists (the 12 ft column (IRC Table R507.5(1))). |
| 13 boards | Pressure-treated 2×82×8 × 12′ | 13 joists 16″ on center across 16′ (12 spaces + 1), each 11′ 9″ long. 2×8 spans 10′ 9″ with a 12″ overhang (southern pine, 16″ o.c.). |
| 1 board | Pressure-treated 2×82×8 × 16′ | Rim joist across the joist ends, 16′ long, 3 screws into each joist end. |
| 1 board | Pressure-treated 2×82×8 × 16′ | Ledger 16′ long, 2×8: at least 2×8 and as deep as the joists (IRC R507.9.1). |
| 1 board | Pressure-treated 2×82×8 × 16′ | 12 blocks of 1′ 2-1/2″ between the joists over the beam: they keep the joists from rolling (DCA 6). Cut 12 × 1′ 2-1/2″ (13 a board) from 16′ boards. |
| 13 hangers | Joist hangersfor 2×8, G185 or stainless | One per joist at the ledger. At least 60% of the joist’s depth; every hole nailed. |
| 13 ties | Hurricane ties (joist to beam)galvanized | One per joist where it crosses the beam (at least 100 lb up and sideways, DCA 6). |
| 4 ties | Deck tension tie, 1,500 lb (for example Simpson DTT2Z)1,500 lb rated | Lateral load: two places within 24″ of the deck’s ends (IRC R507.9.2), each a tie on a deck joist and one on a house floor joist inside, joined through the band joist. |
| 2 rods | Threaded rod ½″ × 3 ft with nuts and washers | One per lateral-load connection, through the ledger and band joist. |
| 14 screws | Lag screws ½″ with washers (hot-dip galvanized)½″ × 4″ + washer | Every 15″ along 16′ for a 10′ 9″ joist span (IRC Table R507.9.1.3(1)), staggered top and bottom, 2″ from the edges. |
| 2 pieces | Z-flashing, 10 ft | Over the top of the ledger, 6″ laps, siding lapped over it (IRC R507.2.4). |
| 1 roll | Self-adhered flashing tape, 6″ × 75 ft | Behind the ledger and over its top: two strips 16′ long, plus the bolt holes. |
| ≈364 (4 boxes of 100) | Connector fastenershanger nails or connector screws | About 10 per hanger and tie and 12 per post base and cap — the size on each connector’s label, not deck screws. |
| ≈183 (2 boxes of 100) | Coated deck screws3″ coated | 3 per joist end into the rim, 2 per block end, and the beam’s plies in two rows every 16″ (10d nails work too). |
| 28 boards | 5/4×6 treated deck board5/4×6 × 16′ | 26 rows of 5-1/2″ boards with 1/8″ gaps across 12′ = 26 boards, +5% for culls and miscuts. |
| ≈676 screws (7 boxes of 100) | Coated deck screws2½″ coated | 2 per board at every joist (DCA 6): ≈338 crossings. |
Sheet S-1 · Deck or balcony
4.88 m × 3.66 m deck
- Deck
- 17.8m² · 4.88 m × 3.66 m
- Footings
- 2483 mm × 1.20 m deep
- Joists
- 132×8 at 406 mm o.c.
- Beam
- 3-2×122 posts, 4.27 m apart
Tools you need
- Tape measure (7.5 m)
- Mason's line + stakes
- Chalk line
- 1.2 m level
- Speed square
- Framing square
29 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 17 bags | Concrete mix, 30 kg30 kg bags | 2 footings: a pad 483 mm across × 152 mm thick at 1.20 m deep, then a 305 mm pier up to 51 mm above the ground = 0.11 m³ each, +10% = 0.24 m³; 30 kg bag ≈ 0.014 m³ (Sakrete). |
| 2 tubes | Concrete form tube305 mm × 1.22 m | One per pier, cut to 1.10 m (from the pad to 51 mm above the ground). |
| 2 posts | Pressure-treated 6×6 post6×6 × 2.44 m | 2 posts, about 368 mm from the pier to the beam: deck 914 mm − decking − joist − beam − 51 mm of pier. Cut each one to the string line, not to a number. |
| 2 bases | Post base or anchor6×6 standoff, galvanized | One per post: holds it on the pier and off the concrete. |
| 2 bolts | Anchor bolt 16 mm with nut and washer16 mm, J-bolt or wedge anchor | One per post base, set in the wet concrete (or drilled in later) per the base’s label. |
| 2 caps | Post-to-beam connector (post cap)for 6×6 and a 3-ply beam | Ties the beam to each post; a 3-ply beam always sits in a post cap. |
| 3 boards | Pressure-treated 2×122×12 × 4.88 m | Beam 3-2×12, 4.88 m long: 3 plies. Posts 4.27 m apart, 305 mm in from each end; this beam spans up to 4.57 m when it carries 1.94 m of joists (the 2.4 m column). |
| 13 boards | Pressure-treated 2×82×8 × 3.66 m | 13 joists 406 mm on center across 4.88 m (12 spaces + 1), each 3.58 m long. 2×8 spans 3.28 m with a 305 mm overhang (deck guide, SPF, 406 mm o.c.). |
| 1 board | Pressure-treated 2×82×8 × 4.88 m | Rim joist across the joist ends, 4.88 m long, 3 screws into each joist end. |
| 1 board | Pressure-treated 2×82×8 × 4.88 m | Ledger 4.88 m long, 2×8: at least 2×8 and as deep as the joists. |
| 1 board | Pressure-treated 2×82×8 × 4.88 m | 12 blocks of 368 mm between the joists over the beam: they keep the joists from rolling. Cut 12 × 368 mm (13 a board) from 4.88 m boards. |
| 1 board | Pressure-treated 2×82×8 × 4.88 m | Joists spanning more than 2.1 m get mid-span restraint: a row of blocks (or strapping) across the middle. Cut 12 × 368 mm (13 a board) from 4.88 m boards. |
| 13 hangers | Joist hangersfor 2×8, G185 or stainless | One per joist at the ledger. At least 60% of the joist’s depth; every hole nailed. |
| 13 ties | Hurricane ties (joist to beam)galvanized | One per joist where it crosses the beam. |
| 12 screws | Lag screws 13 mm with washers (hot-dip galvanized)13 mm, 100 mm or longer | Every 483 mm along 4.88 m for a 3.28 m joist span (deck guide), staggered top and bottom, 51 mm from the edges. |
| 2 pieces | Z-flashing, 3.05 m | Over the top of the ledger, 152 mm laps, siding lapped over it. |
| 1 roll | Self-adhered flashing tape, 152 mm × 22.86 m | Behind the ledger and over its top: two strips 4.88 m long, plus the bolt holes. |
| ≈308 (4 boxes of 100) | Connector fastenershanger nails or connector screws | About 10 per hanger and tie and 12 per post base and cap — the size on each connector’s label, not deck screws. |
| ≈231 (3 boxes of 100) | Coated deck screws76 mm coated | 3 per joist end into the rim, 2 per block end, and the beam’s plies in two rows every 406 mm (10d nails work too). |
| 28 boards | 5/4×6 treated deck board5/4×6 × 4.88 m | 26 rows of 140 mm boards with 3 mm gaps across 3.66 m = 26 boards, +5% for culls and miscuts. |
| ≈676 screws (7 boxes of 100) | Coated deck screws64 mm coated | 2 per board at every joist: ≈338 crossings. |
Sheet M-1 · Railings and guards
12′ glass railing
- Guard
- 36″code: 36″
- Posts
- 44′ on center
- Glass
- 3panels · 28 sq ft · 204 lb
- Length
- 12′of railing
Tools you need
- Tape measure (25 ft)
- Carpenter's pencil
- 4-ft level
- Cordless drill/driver
- Impact driver
- Socket and ratchet set
14 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 4 posts | Glass railing post (drilled for clamps)for a 36″ guard, side mount | 2 ends, 2 between, no more than 5′ apart. |
| 3 panels, 44″ wide × 30-1/2″ tall | Laminated tempered glass panels, made to order9/16″ laminated | One panel per opening: 46″ between posts less 1″ at each post; from 2″ above the floor to 2″ under the top rail. 28 sq ft, about 204 lb in all (68 lb a panel). Laminated with a structural interlayer (SentryGlas or the one the system lists), not plain PVB. Measure the real openings before you order. |
| 12 clamps | Glass clamps (stainless, with gaskets)for 9/16″ glass | Two on each side of every panel. |
| 1 length | Metal top rail with post bracketsflat × 20′ | 12′ of top rail on the posts. |
| 2 boards | Pressure-treated 2×102×10 × 8′ (or your joists’ size) | Two blocks between the joists at each post, fastened with structural screws, so the rim can’t roll (IRC R507.10.1). |
| 16 lags | ⅜″ structural lag screws (galvanized or stainless)⅜″ × 5″, stainless | 4 per post base, fully into solid blocking. Type 316 near salt water or a pool. |
Sheet M-1 · Railings and guards
3.66 m glass railing
- Guard
- 1.07 mcode: 1070 mm
- Posts
- 41.22 m on center
- Glass
- 3panels · 3.1 m² · 106 kg
- Length
- 3.66 mof railing
Tools you need
- Tape measure (7.5 m)
- Carpenter's pencil
- 1.2 m level
- Cordless drill/driver
- Impact driver
- Socket and ratchet set
14 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 4 posts | Glass railing post (drilled for clamps)for a 1070 mm guard, side mount | 2 ends, 2 between, no more than 1.52 m apart. Check the installed height reaches 1070 mm: a 1.07 m (1067 mm) system is 3 mm short. |
| 3 panels, 1.12 m wide × 933 mm tall | Laminated tempered glass panels, made to order13.5 mm laminated | One panel per opening: 1.17 m between posts less 25 mm at each post; from 51 mm above the floor to 51 mm under the top rail. 3.1 m², about 106 kg in all (35 kg a panel). Laminated with a structural interlayer (SentryGlas or the one the system lists), not plain PVB. Measure the real openings before you order. |
| 12 clamps | Glass clamps (stainless, with gaskets)for 13.5 mm glass | Two on each side of every panel. |
| 1 length | Metal top rail with post bracketsflat × 6.10 m | 3.66 m of top rail on the posts. |
| 2 boards | Pressure-treated 2×102×10 × 2.44 m (or your joists’ size) | Two blocks between the joists at each post, fastened with structural screws, so the rim can’t roll. |
| 16 lags | 10 mm structural lag screws (galvanized or stainless)10 × 127 mm, stainless | 4 per post base, fully into solid blocking. Type 316 near salt water or a pool. |
Numbers from StudSheet’s own engine for these answers, generated when this page was built. Open a Sheet to change the answers.
- Drawing
- Plan, elevation or section, with dimensions and numbered keys
- Materials
- Every piece, with the math, grouped by store aisle
- Tools
- What you need, what’s nice to have, what to rent
- Steps
- In the order of work, with dry and cure times
- Stamp
- DIY OK, PRO STEP or PRO JOB
45 Sheets. 16 trades.
From a bedroom repaint to a panel upgrade. Homeowners get the DIY Sheets and an honest page on what’s involved in licensed work. Pros get pro Sheets with quantities, costs, permits and inspections, and estimate templates for every trade.
Sheet index
- 01Build an interior wallCarpentry & framingDIY OK
- 02Build a garden or retaining wallConcrete & masonryDIY OK
- 03Build deck or porch stairsDecks, fences & railingsDIY OK
- 04Paint a roomPaintingDIY OK
- 05Carpet a roomFlooring & tileDIY OK
- 06Install vinyl plank flooringFlooring & tileDIY OK
- 07Tile a floorFlooring & tileDIY OK
- 08Finish a basementGeneral contractingPRO STEP
- 09Hang and finish drywallDrywallDIY OK
- 10Addition shellGeneral contracting · pro SheetPRO STEP
- 11Hardwood and laminate floorsFlooring & tileDIY OK
- 12Paint the outside of a housePaintingPRO STEP
- 13Deck or balconyDecks, fences & railingsDIY OK
- 14Railings and guardsDecks, fences & railingsDIY OK
- 15FenceDecks, fences & railingsDIY OK
- 16Concrete slab or footingsConcrete & masonryPRO STEP
- 17Shingle roofRoofing & sidingPRO STEP
- 18Circuits and wiring runsElectrical · pro SheetPRO JOB
- 19Panel or service upgradeElectrical · pro SheetPRO JOB
- 20Plumbing rough-inPlumbing · pro SheetPRO JOB
- 21Water heater replacementPlumbing · pro SheetPRO JOB
- 22Heating and cooling sizingHVAC · pro SheetPRO JOB
- 23Patch a hole in drywallDrywallDIY OK
- 24Install baseboard and trimCarpentry & framingDIY OK
- 25Hang an interior doorWindows & doorsDIY OK
- 26Closet shelvingCarpentry & framingDIY OK
- 27Mount a TVGeneral contractingDIY OK
- 28Paint kitchen cabinetsPaintingDIY OK
- 29Tile a kitchen backsplashFlooring & tileDIY OK
- 30Tile a shower or tub surroundFlooring & tileDIY OK
- 31Re-caulk a tub, shower or sinkGeneral contractingDIY OK
- 32Replace a toiletPlumbingDIY OK
- 33Replace a bathroom vanityPlumbingDIY OK
- 34Replace a faucetPlumbingDIY OK
- 35Carpet stairsFlooring & tileDIY OK
- 36Build interior or basement stairsCarpentry & framingPRO STEP
- 37Pour concrete steps (brick or stone facing optional)Concrete & masonryPRO STEP
- 38Steel or spiral stairsMetal & glassPRO STEP
- 39Build a paver patioConcrete & masonryDIY OK
- 40Build a raised garden bedDecks, fences & railingsDIY OK
- 41Build a storage shedCarpentry & framingDIY OK
- 42Stain or seal a deck or fencePaintingDIY OK
- 43Install or replace sidingRoofing & sidingPRO STEP
- 44Gutters and downspoutsRoofing & sidingDIY OK
- 45Build a media wallCarpentry & framingDIY OK
- DIY OK
- You can do this.
- PRO STEP
- DIY, with a pro for one step.
- PRO JOB
- Hire it out. Homeowners get what’s involved and quotes; pros get the full Sheet.
Trades with templates
- General contracting
- Carpentry & framing
- Drywall
- Painting
- Flooring & tile
- Decks, fences & railings
- Landscaping and lawn care
- Concrete & masonry
- Roofing & siding
- Windows & doors
- Glass & mirrors
- Metal & glass
- Electrical
- Plumbing
- HVAC
- Commercial
No step-by-step wiring or gas instructions, and no invented structural sizing: beams, headers and cantilevers are the engineer’s call.
Run the job from the same page.
Make your contractor account and the Sheet becomes the start of the paperwork: its counts fill the estimate, the estimate becomes the invoices, and the job goes on the crew’s schedule.
Estimates
Filled from the Sheet’s own counts, your price book and templates for your trade.
Invoices and e-signatures
Clients approve estimates and change orders on a link, with their signature. Deposit, progress and final invoices.
Crew logins
Your crew gets their own sign-in: their jobs, clock in and out, photos back to you to approve. Never your prices.
Schedule
Who’s where, by day or week, by person or by job. Double bookings are flagged.
Service plans
Recurring visits, checklists filled on the phone, QR labels on the equipment.
Stock
What’s in the van and the shop, every move in and out, and a reorder list.
Lead board
Quote requests from homeowners near you, each sent to up to 3 verified local pros. Their contact unlocks when you respond.


- StudSheet Pro
- 14 days free, no card. Then $49 a month (founding price), cancel any time. If you stop, your jobs stay to open, print and export
- Getting paid
- Your payment link, Zelle, Interac e-Transfer or check; cards straight to your own Stripe account, no StudSheet fee
- Lead board
- Free for pros registered in the app
- Your data
- Yours: synced to your account, never sold, and exportable any time
Ask your AI. It works in StudSheet.
Connect your StudSheet account to the AI you already use. Then talk to it like you’d talk to your office: it reads your jobs, clients, crew and price book, and makes the changes you ask for. No API keys, nothing to install.
OPENING NOW The connection is switched on and we’re finishing the last checks with each AI app. Want to be one of the first? Write to support@studsheet.com. The calculators already work in ChatGPT and Claude without an account.
“New job for Dana, repaint a 14×12 bedroom, draft the estimate at my prices”
Adds the client and the job, works out the paint Sheet, and drafts the estimate from your price book. You review it and send it from StudSheet.
“What’s unpaid this month?”
Every open invoice with what’s left to collect, what’s overdue and who owes it.
“Put Mike on the Miller job Thursday”
On the schedule and on the job’s crew, with a heads-up if he’s already booked that day.
“Add these receipt lines to the deck job”
Paste or read out a receipt and it lands in the job’s cost.
1. Add StudSheet to your AI
In ChatGPT, Claude or Gemini, add a custom connector (or app) with this address:
https://mcp.studsheet.com/account. The steps for each are in the app under Me → AI apps.2. Sign in and allow
Your AI sends you to StudSheet. Sign in with your email code and tap Allow. Your password is never shared.
3. Just ask
Changes show up on your phone and computer at the next sync. Disconnect any time in Me → AI apps.
- Works with
- ChatGPT, Claude and Gemini (Gemini: personal Google accounts in the US)
- It can
- Read jobs, clients, crew, schedule, estimates, invoices, receipts and your price book; add and update them when you ask
- It can’t
- See your password, delete anything, or change an estimate your client already approved
- You check
- Estimates stay drafts until you send them. AI apps make mistakes
Tools that protect your price. A place for the whole trade.
New for contractors this month: twice the Sheets, bigger jobs, a sketch with your own prices for anything no Sheet covers, and messages from your clients. Also new: a board where contractors, crews and workers find each other, starting in New Jersey and Staten Island.
New
Estimates that hold up
“Included” and “Not included” lists for each trade, signed by the client with the price, and a valid-until date after which the link asks for an updated price. One tap re-prices and resends.
Your client’s job page
One link per job, no app for the homeowner: progress updates with photos, change orders with photos, what’s been paid and what’s next, the estimate to sign and invoices to pay.
Sign and pay on the phone
A QR code on the printed estimate, the deposit by card straight into your own Stripe account, and your logo on every document.
Faster Sheets for pros
Answers grouped so a Sheet opens on the sizes, trade wording in Pro mode, the materials price as you type, and your usual choices saved once.
Send to the yard
The job’s materials go to your supply house as a quote request, grouped the way they pick it. QuickBooks Online export for your invoices.
Your AI, on your jobs
“Ask your AI” on every Sheet, and ChatGPT, Claude or Gemini connected to your account can change a Sheet on a job or explain its permits and inspections. How it works.
45 Sheets, bigger jobs
22 new: backsplash, shower tile, trim, doors, inside and steel stairs, siding, gutters, pavers and more. Rooms up to 200 ft, taller walls, houses up to 3 stories, basements drawn room by room. See the list.
Sketch and price
For work no Sheet covers: sketch it with every size on it, then add your prices. Each price line takes its quantity off the sketch, repeated for every floor, and the price follows as you type a size. Save your price sheet and start the next job from it.
Messages from your client
Your client writes to you from their job page, no app needed. You get an email and the message in the job folder; forward it to the crew in one tap.
Jobs & crew board
Need two helpers tomorrow at 7? Post it with the pay shown; workers who are free tap “I’m interested”. Free cards for workers, in English and Spanish. How the board works.
Next
Sheets from what you ask for
Shower glass, storefront glass and iron gates first, then what contractors and searches ask for most.
Apps for your phone
iPhone, iPad and Android, with the same account and jobs as the web. Coming soon; the web app works on any phone today.
PILOT Contractors and workers in NJ and Staten Island who want in early: write to support@studsheet.com.
In the truck. At the table. At the desk.
The same app on iPhone, Android and the web, in light or dark. The math runs on your device: no waiting on a server, and in the phone apps, no signal needed.




- iPhone and Android
- Waiting for App Store and Google Play approval
- Web
- app.studsheet.com, in any modern browser
- Light or dark
- Follows your device, or pick one in Settings
- On the device
- Jobs, clients and lists are saved on your phone or computer; sync is optional
Ask people who’ve done it.
Post a question with your Sheet attached. Answers come from homeowners who’ve done the job and pros who do it for a living. Anyone can read it, from anywhere, sorted by trade. Contractors post day work on the jobs board, and neighbors swap leftover materials on the town board.
- Verified pro
Pros checked by the StudSheet team carry the badge, so you know who does this for a living.
- StudSheet team
Starter answers come from the team’s own labeled account, never from made-up users.
- Founding member
Early members get the badge and invite links for people they know.
No invented users, reviews, posts or activity. Anything written by AI is labeled as AI.
Your state’s rules, built in.
Set your state and the Sheets follow its code: the IRC and the NEC, with notes where your state or city differs, New York City included. Working in Canada? Pick your province for the National Building Code and metric.
- Units
- Feet and inches, or metric if you prefer
- Codes
- Cited on the line that uses them
- Prices
- Typical US store prices
- Always
- Confirm with your building department
Advertise on StudSheet.
Put your store, yard or trade in front of people planning a job. Sponsor cards show in the Community tab, chosen by the area each person set.
Local spot
ZIP codes, postal codes, or a whole state or province, for the dates you choose. For lumber yards, supply houses and local trades.
Nationwide spot
Every area, for the dates you choose. For tool and material brands.
- Labeled Sponsored, one card per screen.
- Picked on the person’s device from the area they set. Nothing about them is sent to choose it, and nothing is tracked.
- Never on a client’s link or a printout.
- Founding sponsors run free while their area grows; then $49 a month per area, with 30 days’ notice.
Ask about a sponsor spotOr tap “Advertise here” on the card in the app.
Questions.
Is StudSheet free?
For homeowners, yes, always: Sheets, jobs, the shopping list and build mode. For contractors, StudSheet Pro is free for 14 days with no card, then $49 a month at the founding price. Cancel any time; your jobs stay to open, print and export.
Do I need an account?
Not as a homeowner: Sheets, jobs, lists and the Tool Shed are saved on your device. Contractors make an account with their email (a 6-digit code, no password) so jobs sync between phone and computer and clients can sign and pay on their link.
When is it on iPhone and Android?
The apps are waiting for App Store and Google Play approval. Until then StudSheet runs in any browser at app.studsheet.com, and you can add it to your home screen.
Does it work in Canada?
Yes. Set your province for the National Building Code, the CEC and provincial notes, and pick metric if you like. US prices aren’t shown in Canada.
Where do the numbers come from?
Each Sheet’s math runs on your device and shows its work under “How we got this”, with the code section or manufacturer guide it relies on. Anything that isn’t a published rule is marked typical. Code notes are a starting point: confirm with your building department.
Will it tell me how to wire a panel?
No. For homeowners, electrical, gas, plumbing and HVAC systems, additions and load-bearing walls go to a page on what’s involved and how to get quotes. Pros get quantities, costs, permits and inspection checklists, never step-by-step wiring or gas instructions.
Where do quote requests go?
Only to pros registered and verified in the app, up to 3 local pros per request. Pros see the job and the area; your contact goes only to a pro who responds. If no pros cover your area yet, the app says so and keeps your request open for 30 days.
More questions?
Billing, your data, Canada, the code notes and connecting your AI: all the answers.
Who makes StudSheet?
StudSheet is built by IONIAN Digital. Questions: support@studsheet.com. StudSheet is on Instagram and YouTube.