Sign in Open StudSheet

StudSheet Sheets Plumbing · Sheet S-20

Plumbing rough-in takeoff

3 fixtures: 5 drain fixture units, a 3″ drain branch, 1½″ vents and ¾″ + ½″ water lines, every fitting counted. For plumbers: supply and drain pipe by size, fittings, valves and vents for the fixtures you are adding.

Homeowners see what’s involved and can ask for quotes; contractors get the full Sheet with StudSheet Pro.

Worked example · feet and inches (New Jersey) or metric (Ontario)

Sheet S-20 · Plumbing rough-in

3 fixtures

PRO JOB
RISER DIAGRAMDrains, vents and water lines — not to scaleto building drainCOexisting stackWCLavTubfrom the main and the heaterdrain / wasteventcoldhot12345678ROUGH-IN CARDTypical heights above the finished floor — the fixture’s spec sheet winsFixtureTrapArm maxDrainWaterToilet3″12′flange 12″ off the finished wall, 15″ to a side wallcold 6–8″ up, 6″ left of centerLavatory1¼″5′trap arm 18–20″ up20–22″ up, 4″ each side of centerTub/shower1½″6′tub drain per the tub (left or right)valve 28–32″ up; spout 4″ over the rim
Riser diagram + rough-in card
Drain load
5DFU · IPC
Branch
3″¼″ per foot
Vents
1½″1½″ header
Water
¾″ + ½″trunk + branches · 5 outlets

Tools you need

  • Tape measure (25 ft)
  • Carpenter's pencil
  • 4-ft level
  • Torpedo level
  • Cordless drill/driver
  • Right-angle drill

20 tools on the Sheet, each marked own, buy or rent

What to buy 22 lines, each with its math
BuyItemHow we got this
6 × 10′ lengthsPVC DWV pipe, 1½ in1½″ PVC DWV, Schedule 40vent for 1 toilet 6 ft + 1 lavatory 4 ft + vent for 1 lavatory 6 ft + 1 tub/shower 5 ft + vent for 1 tub/shower 6 ft + vent header 20 ft = 47 ft, + 10% for cuts → 6 × 10′.
3 × 10′ lengthsPVC DWV pipe, 3 in3″ PVC DWV, Schedule 401 toilet 4 ft + branch 20 ft = 24 ft, + 10% for cuts → 3 × 10′.
27 fittingsDWV fittings, 1½ in (PVC or ABS)1½″ PVC DWVAllowance: the trap or bend, tees and elbows at each fixture (3–4), 3 per vent, a wye or combo per fixture on the branch, long sweeps, and a coupling between lengths.
10 fittingsDWV fittings, 3 in (PVC or ABS)3″ PVC DWVAllowance: the trap or bend, tees and elbows at each fixture (3–4), 3 per vent, a wye or combo per fixture on the branch, long sweeps, and a coupling between lengths.
2 pint setsPVC primer and cement (pint set)About 130 joint-equivalents (a 3″ joint takes about 2½ times the cement of a 1½″ one); a pint does about 90 of the small ones.
1 × 100′ coilPEX-A tubing, ½ in½″ PEX-A5 branches × 6 ft = 30 ft, + 10% → 1 × 100′ coil. ½″ to every fixture (the codes allow ⅜″ for some — lavatories and toilets — but ½″ covers all).
1 × 100′ coilPEX-A tubing, ¾ in¾″ PEX-Acold trunk 25 ft + hot trunk 25 ft = 50 ft, + 10% → 1 × 100′ coil. Sized for 3.6 WSFU → 7.4 gpm on Hunter’s curve, under 8 ft/s (¾″ minimum).
15 fittingsPEX-A expansion fittings½–1″A tee and two elbows per outlet (5 outlets).
41 ringsPEX-A expansion ringssized to the tubingAbout 2½ tube ends per fitting (15) + 1 per stub-out (3).
2 valvesBall valve, ¾ in¾″ full portShutoff where each new trunk leaves the main, so the new work can be isolated.
3 stub-outsStub-out elbows½″One per supply at sinks, lavatories, toilets and laundry tubs.
3 capsTest caps for stub-outs½″Caps the stub-outs for the water test and keeps them clean until trim-out.
3 stopsQuarter-turn angle stops½″ × ⅜″ compression2 per sink, lavatory and laundry tub, 1 per toilet. Bought now, set at trim-out.
1 valveTub/shower valve bodypressure-balance or thermostaticOne per tub/shower and shower: an individual shower valve must limit the temperature (ASSE 1016 or 1070).
1 kitTub drain and overflowmatch the tubDrain and overflow for each tub.
1 flangeCloset flange3″ × 4″One per toilet, set to the finished floor height.
1 trapP-trap, 1½ in (DWV)1½″Tubs and showers: traps that go in at rough-in.
1 adapterTrap adapters, 1½ in1½″The wall stub for each sink, lavatory and laundry tub trap.
1 cleanoutCleanout fittings with plugs3″At the upper end of the branch (IPC 708: at the base of each stack and every 100 ft); add one at each change of direction over 135°.
11 platesNail plates (steel)16-gaugeOne where each drain (3), supply (5) and vent (3) passes a stud or plate within 1¼″ of its face.
18 hangersDWV pipe hangersfor PVCOne every 4′ on horizontal pipe (IPC Table 308.5).
30 clipsSupply pipe clipsfor PEX-AOne every 2′ 8″ along 80 ft of water pipe (IPC Table 308.5).
Plumbing · Sheet S-20 · 01What to buy (3 fixtures)

What to buy (3 fixtures)

Every line shows the quantity to buy and how StudSheet got it: the spacing, the waste and the package size, so you can check it before the supply house or the quote.

BuyMaterialHow StudSheet counts itWhat it is for
6 × 10′ lengthsPVC DWV pipe, 1½ in (1½″ PVC DWV, Schedule 40)vent for 1 toilet 6 ft + 1 lavatory 4 ft + vent for 1 lavatory 6 ft + 1 tub/shower 5 ft + vent for 1 tub/shower 6 ft + vent header 20 ft = 47 ft, + 10% for cuts → 6 × 10′.Schedule 40 PVC drain, waste and vent pipe, solvent-welded.
3 × 10′ lengthsPVC DWV pipe, 3 in (3″ PVC DWV, Schedule 40)1 toilet 4 ft + branch 20 ft = 24 ft, + 10% for cuts → 3 × 10′.Schedule 40 PVC for toilet drains, stacks and building drains; also power-vent and tankless vent pipe where the maker allows PVC.
27 fittingsDWV fittings, 1½ in (PVC or ABS) (1½″ PVC DWV)Allowance: the trap or bend, tees and elbows at each fixture (3–4), 3 per vent, a wye or combo per fixture on the branch, long sweeps, and a coupling between lengths.Sanitary tees, wyes, elbows and couplings for drains and vents; match the pipe (PVC or ABS).
10 fittingsDWV fittings, 3 in (PVC or ABS) (3″ PVC DWV)Allowance: the trap or bend, tees and elbows at each fixture (3–4), 3 per vent, a wye or combo per fixture on the branch, long sweeps, and a coupling between lengths.Closet bends, wyes, combos, long sweeps and couplings; match the pipe.
2 pint setsPVC primer and cement (pint set)About 130 joint-equivalents (a 3″ joint takes about 2½ times the cement of a 1½″ one); a pint does about 90 of the small ones.Purple primer and PVC cement. Some places don’t require the primer — use it anyway unless the inspector says otherwise.
1 × 100′ coilPEX-A tubing, ½ in (½″ PEX-A)5 branches × 6 ft = 30 ft, + 10% → 1 × 100′ coil. ½″ to every fixture (the codes allow ⅜″ for some — lavatories and toilets — but ½″ covers all).Expansion PEX (ASTM F876) for water lines; joined with expansion rings and fittings.
1 × 100′ coilPEX-A tubing, ¾ in (¾″ PEX-A)cold trunk 25 ft + hot trunk 25 ft = 50 ft, + 10% → 1 × 100′ coil. Sized for 3.6 WSFU → 7.4 gpm on Hunter’s curve, under 8 ft/s (¾″ minimum).Expansion PEX for trunks and manifold feeds.
15 fittingsPEX-A expansion fittings (½–1″)A tee and two elbows per outlet (5 outlets).Tees, elbows and couplings for expansion PEX (ASTM F1960), ½ to 1 in. An average fitting.
41 ringsPEX-A expansion rings (sized to the tubing)About 2½ tube ends per fitting (15) + 1 per stub-out (3).One ring on every tube end.
2 valvesBall valve, ¾ in (¾″ full port)Shutoff where each new trunk leaves the main, so the new work can be isolated.Full-port shutoff for a new trunk, a water heater’s cold supply or a manifold feed.
3 stub-outsStub-out elbows (½″)One per supply at sinks, lavatories, toilets and laundry tubs.Copper stub-out ells or drop-ear elbows that bring each supply through the wall at the right height.
3 capsTest caps for stub-outs (½″)Caps the stub-outs for the water test and keeps them clean until trim-out.Push-on caps that hold the pressure test and keep the stubs clean until trim-out.
3 stopsQuarter-turn angle stops (½″ × ⅜″ compression)2 per sink, lavatory and laundry tub, 1 per toilet. Bought now, set at trim-out.One per supply at sinks, lavatories, toilets and laundry tubs; set at trim-out.
1 valveTub/shower valve body (pressure-balance or thermostatic)One per tub/shower and shower: an individual shower valve must limit the temperature (ASSE 1016 or 1070).Pressure-balance or thermostatic rough-in valve (ASSE 1016 / 1070) that limits the outlet temperature; trim later.
1 kitTub drain and overflow (match the tub)Drain and overflow for each tub.Bath waste and overflow kit for the tub.
1 flangeCloset flange (3″ × 4″)One per toilet, set to the finished floor height.Toilet flange with a steel or stainless ring, on the 3 in or 4 in closet bend.
1 trapP-trap, 1½ in (DWV) (1½″)Tubs and showers: traps that go in at rough-in.Solvent-weld P-trap for tubs, showers and laundry tubs roughed in below the floor.
1 adapterTrap adapters, 1½ in (1½″)The wall stub for each sink, lavatory and laundry tub trap.Wall stub for a sink or lavatory P-trap (the tubular trap goes in at trim-out).
1 cleanoutCleanout fittings with plugs (3″)At the upper end of the branch (IPC 708: at the base of each stack and every 100 ft); add one at each change of direction over 135°.Cleanout tee or adapter with a plug, full size of the pipe up to 4 in; reachable after the walls close.
11 platesNail plates (steel) (16-gauge)One where each drain (3), supply (5) and vent (3) passes a stud or plate within 1¼″ of its face.Steel shield plates over pipe that runs within 1¼″ of the face of a stud or plate.
18 hangersDWV pipe hangers (for PVC)One every 4′ on horizontal pipe (IPC Table 308.5).J-hooks, straps or clamps for drain and vent pipe at the code spacing.
30 clipsSupply pipe clips (for PEX-A)One every 2′ 8″ along 80 ft of water pipe (IPC Table 308.5).PEX, copper or CPVC clips and straps at the code spacing.

In Canada (3 fixtures)

Set to Canada, the Sheet works the job out again for Ontario: metric sizes, bag sizes, the frost depth and the code notes. It doesn't just convert feet to meters. The first lines:

  • 5 × 3.66 m lengths, PVC DWV pipe, 1½ in: vent for 1 toilet 1.83 m + 1 lavatory 1.22 m + vent for 1 lavatory 1.83 m + 1 tub/shower 1.52 m + vent for 1 tub/shower 1.83 m + vent header 6.10 m = 14.33 m, + 10% for cuts → 5 × 3.66 m.
  • 3 × 3.66 m lengths, PVC DWV pipe, 3 in: 1 toilet 1.22 m + branch 6.10 m = 7.32 m, + 10% for cuts → 3 × 3.66 m.
  • 26 fittings, DWV fittings, 1½ in (PVC or ABS): Allowance: the trap or bend, tees and elbows at each fixture (3–4), 3 per vent, a wye or combo per fixture on the branch, long sweeps, and a coupling between lengths.
  • 10 fittings, DWV fittings, 3 in (PVC or ABS): Allowance: the trap or bend, tees and elbows at each fixture (3–4), 3 per vent, a wye or combo per fixture on the branch, long sweeps, and a coupling between lengths.
  • 2 473 mL can sets, PVC primer and cement (pint set): About 128 joint-equivalents (a 3 in joint takes about 2½ times the cement of a 1½ in one); a 473 mL can does about 90 of the small ones.
  • 1 × 30.48 m coil, PEX-A tubing, ½ in: 5 branches × 1.83 m = 9.14 m, + 10% → 1 × 30.48 m coil. ½ in to every fixture (the codes allow ⅜ in for some — lavatories and toilets — but ½ in covers all).
Plumbing · Sheet S-20 · 02The order of work, for the licensed pro

The order of work, for the licensed pro

  1. Pull the plumbing permit (plumbing subcode, filed by the master plumber) and post it on site.
  2. Lay out from the fixture spec sheets and the finished wall and floor lines: drain centers, trap arm heights and supply stubs (the rough-in card on the drawing has typical heights).
  3. Bore and notch within the framing code’s limits — ask the framer or engineer before cutting any joist, beam or truss — and put nail plates where pipe sits within 1¼″ of the face.
  4. Set the closet flange, tub and shower drains and the traps, then run the drain branch to the stack or main at ¼″ per foot — wyes and long sweeps for horizontal turns, sanitary tees only from horizontal into vertical.
  5. Run the vents: every trap arm within its limit, every vent off the top of its trap arm and up at least 6″ above the flood rim before it turns flat, the header into the existing vent stack.
  6. Run the water lines: trunk and branches in PEX-A, hot on the left, strapped at the code spacing; stub out and cap every outlet.
  7. Test the drains and vents once the solvent-welded joints have set: filled with water to the top, at least a 10 ft head, for 15 minutes, or air at 5 psi for 15 minutes — plastic DWV only where the pipe maker allows air (IPC 312).
  8. Test the water lines: at least the working pressure with water, or air at 50 psi on metal pipe — not on plastic (IPC 312.5).
  9. Rough-in inspection with the tests holding, the caps on and the nail plates in — before insulation and drywall.
  10. After drywall: stops, traps and fixtures at trim-out, then the final inspection.
Plumbing · Sheet S-20 · 03Tools (20)

Tools (20)

Must-have tools first, then the ones that help and the ones to rent for the day.

ToolNeedWhy
Tape measure (25 ft)Must haveThe red boxes every 16″ on the blade are stud spacing.
Carpenter's pencilMust haveFlat, doesn't roll away, marks rough lumber.
4-ft levelMust haveSlope on every drain run
Torpedo levelMust havePlumb stub-outs and trap arms
Cordless drill/driverMust haveDrills holes, drives screws, mixes small batches.
Right-angle drillMust haveBores studs and joists for drains and supply
Auger bit setMust haveClean holes for 1½–2″ pipe
Hole saw kitMust haveHoles for 3″ drains and the flange
Reciprocating sawMust haveOpens walls and cuts old pipe
PVC pipe cutterMust haveSquare cuts in 1½–2″ pipe (a saw for 3″ and up)
HandsawGood to haveCuts 3–4″ pipe with a miter box
Deburring toolMust haveClean cut ends before cementing
PEX expansion toolMust haveExpansion joints on PEX-A
PEX cutterMust haveScissor cutter for clean, square cuts in PEX and plastic tubing.
Test plugsMust haveSeal the drains for the water or air test
Pressure test pumpMust havePressurizes the water lines for the test
Tongue-and-groove pliersMust haveAdjustable pliers for slip nuts, fittings and drain parts.
Safety glassesMust haveEvery cut, every nail, every time.
Work glovesMust havePrimer, cement, flux and freshly cut pipe
Work lightMust haveInside walls, under floors and in crawl spaces
Plumbing · Sheet S-20 · 04Mistakes and how the math works

Mistakes and how the math works

Mistakes that cost a callback or a second trip

  • Roughing in before the fixtures are picked: Toilets come in 10″, 12″ and 14″ rough-ins, tub drains go left or right, and wall-mount faucets need their own stubs. Get the spec sheets first.
  • A sanitary tee on its back: Sanitary tees only turn flow from horizontal into vertical. On a horizontal drain they choke the flow and fail inspection — use a wye or a combo.
  • A vent below the trap weir: A vent that leaves the trap arm below the weir, or a trap arm longer than the table allows, siphons the trap dry and lets sewer gas in.
  • Air-testing plastic drains: Many PVC and ABS makers forbid testing their pipe with compressed air: a fitting that lets go can shatter. Water-test unless the maker and the inspector allow air.
  • No nail plates: A drywall screw through a drain or a water line shows up months later as a stain on the ceiling. Plate every pipe within 1¼″ of the face.

What the calculator assumes

  • Code: the National Standard Plumbing Code (NSPC 2021), New Jersey’s plumbing subcode. New Jersey enforces the National Standard Plumbing Code (NSPC 2021, N.J.A.C. 5:23-3.15). These sizes use the IPC tables as a cross-check; the NSPC’s tables differ in places — check each size against it. Confirm with your building department.
  • Fixture units (IPC Table 709.1): bathroom group 5 (1.6 gpf toilet), toilet 3, lavatory 1 (1¼″ trap), tub or shower 2 (1½″), kitchen sink 2 with or without a dishwasher, dishwasher alone 2, washer 2 (2″), laundry tub 2, sink 2, floor drain 2 (an emergency floor drain 0).
  • Horizontal branches (IPC Table 710.1(2)): 1½″ 3 DFU, 2″ 6, 3″ 20, 4″ 160; stacks of three branch intervals or fewer: 2″ 10, 3″ 48, 4″ 240. Building drains at ¼″ per foot (2%) (Table 710.1(1)): 2″ 21, 3″ 42, 4″ 216. Any drain a toilet uses: 3″ minimum. 2½″ is skipped: stores rarely stock it.
  • Trap arms (IPC Table 909.1): 1¼″ 5′, 1½″ 6′, 2″ 8′, 3″ 12′, 4″ 16′.
  • Vents: at least half the drain they serve and 1¼″ minimum (bought as 1½″); a 3″ vent through the roof for a new stack (cold climates require it so frost can’t close it).
  • Slope: ¼″ per foot (2%) on small drains (IPC Table 704.1).
  • Water: fixture units per fixture (IRC P2903.6): toilet 2.2, lavatory 0.7, tub or shower 1.4, kitchen sink 1.4, dishwasher 1.4, washer 1.4, laundry tub 1.4, hose bib 2.5 (1.0 each after the first); a full bath 3.6, half bath 2.6, kitchen or laundry pair 2.5. Peak flow on Hunter’s curve (IPC Appendix E); trunks ¾″ minimum, sized to 8 ft/s (5 ft/s hot in copper, UPC 610.12).
  • Allowances (typical): fixture drains 4–5 ft (a washer 7 ft with its standpipe), a 6 ft vent per fixture, 6 ft per branch to a fixture, 10 ft manifold feeds, +10% on every pipe for cuts; PEX in 100′ and 300′ coils.
  • Hangers: plastic DWV every 4 ft, cast iron every 5 ft, PEX every 32″, copper every 6 ft, CPVC every 3 ft (typical of IPC Table 308.5 and UPC Table 313.3).
  • Gas piping for a range, dryer or water heater isn’t on this Sheet: the licensed gas fitter sizes and tests it.
Plumbing · Sheet S-20 · 05Code, permits and safety

Code, permits and safety

The Sheet sets its code notes for the job's state or province. These are New Jersey's and Ontario's; the code reference has more. Always confirm with your building department.

  • Sized with the IPC tables: Code here: the National Standard Plumbing Code (NSPC 2021), New Jersey’s plumbing subcode. Fixture units and trap sizes from IPC Table 709.1; branches and stacks from IPC Table 710.1(2), the building drain from 710.1(1); trap arms from Table 909.1. New Jersey enforces the National Standard Plumbing Code (NSPC 2021, N.J.A.C. 5:23-3.15). These sizes use the IPC tables as a cross-check; the NSPC’s tables differ in places — check each size against it. Confirm with your building department.
  • License and permit: New Jersey: plumbing is done by a master plumber licensed by the NJ State Board of Examiners of Master Plumbers, or by workers under one; the master plumber’s license number and seal go on the plumbing subcode permit application at the town’s construction office (N.J.A.C. 5:23-2.15). Inspections: rough-in with the tests holding, before the walls close; final once the fixtures are in.
  • Tests the inspector watches: Drains and vents: filled with water to the top, at least a 10 ft head, for 15 minutes, or air at 5 psi for 15 minutes — plastic DWV only where the pipe maker allows air (IPC 312). Water lines: at least the working pressure with water, or air at 50 psi on metal pipe — not on plastic (IPC 312.5). Final inspection with the fixtures set and working.
  • Sized with the NPC tables: Code here: the Ontario Building Code (Part 7, Plumbing). Fixture units and trap sizes from OBC 7.4.9.3; branches, stacks and building drains from OBC 7.4.10.6; vents from OBC 7.5.7; trap arms from OBC 7.5.6.3. Confirm with your building department.
Plumbing · Sheet S-20 · 06Questions

Questions

What materials do I need to rough in plumbing?

For the worked example, a 3 fixtures, the Sheet counts 22 lines with waste included, starting with pVC DWV pipe, 1½ in (6 × 10′ lengths), pVC DWV pipe, 3 in (3 × 10′ lengths), dWV fittings, 1½ in (PVC or ABS) (27 fittings), dWV fittings, 3 in (PVC or ABS) (10 fittings). Each line's math is in the table above. Put in your own sizes in the plumbing calculator and every line is counted again.

How long does it take to rough in plumbing, and can I do it myself?

About 15 to 22 hours for the worked example, in 10 steps. StudSheet stamps it PRO JOB: hire this out (pros get the full Sheet).

What tools do I need to rough in plumbing?

20 in all. The must-haves start with tape measure (25 ft), carpenter's pencil, 4-ft level, torpedo level, cordless drill/driver, right-angle drill. On the Sheet you mark each one as owned, to buy or to rent.

Plumbing · Sheet S-20 · 07Ask about it

Ask about it

Stuck while you rough in plumbing? Ask in the Plumbing rough-in group of the StudSheet community with this Sheet attached. Homeowners who've done it and verified pros answer, and anyone can read it.

Plumbing · Sheet S-20 · 08More plumbing Sheets

More plumbing Sheets

  • Plumbing for contractors: run this takeoff at your own prices, send the estimate, and get it signed and the deposit paid.
  • Water heater replacement (Gas water heater, 4 people): For plumbers: tank or tankless, venting, expansion tank, relief line, connections and the permit.
  • Replace a toilet (Toilet, 12″ rough-in): Measure the rough-in, pick a toilet that fits, and swap it with a new seal, bolts and supply line — plus what to do about a broken flange.
  • Replace a bathroom vanity (30″ vanity): A vanity that fits the space and the pipes, its top and faucet, new supply lines, trap, shims and sealant — swapped in an afternoon.
  • Replace a faucet (Kitchen faucet): A kitchen or bathroom faucet that fits your sink’s holes, new supply lines, the right sealant, and a leak check — or a cartridge for a drip.
  • All 45 Sheets, across 16 trades.
  • Code reference: frost depths, guard heights, stairs, retaining walls.

Get the Sheet.

Open StudSheet
Coming soon on theApp StoreComing soon onGoogle Play