Sign in Open StudSheet

StudSheet Sheets Plumbing · Sheet S-33

Replace a bathroom vanity

30″ vanity: the vanity fits (33″ of room), a 4 in centerset faucet, 2 supply lines (20″ braided) and a new trap. A vanity that fits the space and the pipes, its top and faucet, new supply lines, trap, shims and sealant — swapped in an afternoon.

Free, no account needed. Type your own sizes and every line is counted again.

Worked example · feet and inches (New Jersey) or metric (Ontario)

Sheet S-33 · Replace a bathroom vanity

30″ vanity

DIY OK
ELEVATIONthe wall behind the vanity18″30″ vanity1234
Pipes, studs + clearance
Vanity
30″with top
Faucet
new4 in centerset
Supply lines
220″ braided
Fit
fits33″ of room

Tools you need

  • Basin wrench
  • Tongue-and-groove pliers
  • Hacksaw
  • 4-ft level
  • Stud finder
  • Cordless drill/driver

15 tools on the Sheet, each marked own, buy or rent

What to buy 9 lines, each with its math
BuyItemHow we got this
1 vanityVanity with top, 30″30″, single sink, with top, drilled for 4 in centersetCabinet, top and sink in one box. Check the drawers clear the pipes.
1 faucetBathroom faucet, basic4 in centersetMatch the holes in the top. Most come with their pop-up drain.
1 kitP-trap kit, 1¼ inwith a tailpiece extensionThe new sink’s drain rarely lines up with the old trap: a new trap and an extension you cut to fit.
2 linesFaucet supply line, braided⅜ in compression to the faucet’s thread, 20″ braidedHot and cold for each sink; skip them if the faucet comes with its lines attached.
1 tubPlumber’s puttya small tubUnder the drain flange. On a stone top, silicone instead (putty can stain it).
1 rollThread seal tape (PTFE)½ in rollFor threaded joints only (a threaded stop or drain) — never on compression nuts or slip joints.
1 tube100% silicone, color-matchedclear or white, kitchen and bathDabs under the top, the joint along the wall and both joints of the backsplash: about 9 ft at a 3/16″ bead, about 55 ft a 10.1 oz tube.
1 packPlastic shimspack of 6–8Level the cabinet on an uneven floor or wall.
1 box3″ framing screwsthrough the back railTwo or more screws through the back rail into two studs.
Plumbing · Sheet S-33 · 01What to buy (30″ vanity)

What to buy (30″ vanity)

Every line shows the quantity to buy and how StudSheet got it: the spacing, the waste and the package size, so you can check it before the supply house or the quote.

BuyMaterialHow StudSheet counts itWhat it is for
1 vanityVanity with top, 30″ (30″, single sink, with top, drilled for 4 in centerset)Cabinet, top and sink in one box. Check the drawers clear the pipes.A cabinet with its top and sink, about 30–31″ wide.
1 faucetBathroom faucet, basic (4 in centerset)Match the holes in the top. Most come with their pop-up drain.A single-handle or two-handle bathroom faucet, usually with its drain. Match the holes in the top.
1 kitP-trap kit, 1¼ in (with a tailpiece extension)The new sink’s drain rarely lines up with the old trap: a new trap and an extension you cut to fit.A tubular trap with a tailpiece extension and slip nuts for a bathroom sink.
2 linesFaucet supply line, braided (⅜ in compression to the faucet’s thread, 20″ braided)Hot and cold for each sink; skip them if the faucet comes with its lines attached.Braided stainless line from the shutoff (⅜ in compression) to the faucet (½ in or ⅜ in, by the faucet).
1 tubPlumber’s putty (a small tub)Under the drain flange. On a stone top, silicone instead (putty can stain it).Seals a drain flange or a faucet base. Not on marble or granite (it can stain): silicone there.
1 rollThread seal tape (PTFE) (½ in roll)For threaded joints only (a threaded stop or drain) — never on compression nuts or slip joints.For threaded joints only — never on compression fittings.
1 tube100% silicone, color-matched (clear or white, kitchen and bath)Dabs under the top, the joint along the wall and both joints of the backsplash: about 9 ft at a 3/16″ bead, about 55 ft a 10.1 oz tube.Flexible movement joint at walls and the tub.
1 packPlastic shims (pack of 6–8)Level the cabinet on an uneven floor or wall.Composite shims that don’t rot or compress: steady a toilet or level a vanity on an uneven floor.
1 box3″ framing screws (through the back rail)Two or more screws through the back rail into two studs.Construction screws for framing by hand. (16d nails if you use a nailer.)

In Canada (762 mm vanity)

Set to Canada, the Sheet works the job out again for Ontario: metric sizes, bag sizes, the frost depth and the code notes. It doesn't just convert feet to meters. The first lines:

  • 1 vanity, Vanity with top, 762 mm: Cabinet, top and sink in one box. Check the drawers clear the pipes.
  • 1 faucet, Bathroom faucet, basic: Match the holes in the top. Most come with their pop-up drain.
  • 1 kit, P-trap kit, 1¼ in: The new sink’s drain rarely lines up with the old trap: a new trap and an extension you cut to fit.
  • 2 lines, Faucet supply line, braided: Hot and cold for each sink; skip them if the faucet comes with its lines attached.
  • 1 tub, Plumber’s putty: Under the drain flange. On a stone top, silicone instead (putty can stain it).
  • 1 roll, Thread seal tape (PTFE): For threaded joints only (a threaded stop or drain) — never on compression nuts or slip joints.
Plumbing · Sheet S-33 · 02The steps, in order

The steps, in order

  1. Shut off the hot and cold stops, open the faucet to let the pressure off, and put a bucket under the trap.
  2. Disconnect the supply lines and the trap, cut the caulk, unscrew the vanity from the wall, and lift off the top, then the cabinet.
  3. Check the stops and the drain arm: valves that won’t shut or a corroded drain get fixed now (a plumber for old galvanized pipe).
  4. Mark the studs; measure the pipes from the wall and the floor, trace them onto the new cabinet’s back and cut neat holes.
  5. Set the new vanity: level it, shim it, and screw through the back rail into two studs.
  6. Fit the faucet and the drain on the top before it goes on — much easier on a bench.
  7. Set the top on a few dabs of silicone; connect the supply lines hand-tight + ¼ turn and the trap, cutting the tailpiece to fit.
  8. Turn the water on slowly, check every joint with a paper towel, then fill the sink and let it drain.
  9. Caulk: set the backsplash in silicone, then run a bead where it meets the top and the wall.
Plumbing · Sheet S-33 · 03Tools (15)

Tools (15)

Must-have tools first, then the ones that help and the ones to rent for the day.

ToolNeedWhy
Basin wrenchMust haveThe faucet’s nuts if it goes on after the top
Tongue-and-groove pliersMust haveSlip-joint trap nuts and the supply nuts
HacksawMust haveCuts the tailpiece to fit
4-ft levelMust haveLevels the cabinet both ways
Stud finderMust haveTwo studs for the back rail
Cordless drill/driverMust havePilot holes, screws, hole cutouts
JigsawMust haveCuts the pipe holes in the cabinet back
Screwdriver setMust haveOutlet covers, hardware, toilet bolts.
Utility knife + bladesMust haveCuts the old caulk
Caulk gunMust haveDispenses caulk and adhesive.
5-gal buckets (2)Must haveUnder the trap
Work lightGood to haveInside the cabinet
Shop vacGood to haveDrywall dust, grout, sawdust.
Work glovesMust haveTack strip, block and lumber shred hands.
Safety glassesMust haveEvery cut, every nail, every time.
Plumbing · Sheet S-33 · 04Mistakes and how the math works

Mistakes and how the math works

Mistakes that cost a callback or a second trip

  • Pipes behind the drawers: Measure the valve and drain heights against the new cabinet’s drawers before you buy.
  • Holes too big: Trace from the pipes and cut neat holes; a hole saw makes clean ones.
  • Faucet holes that don’t match: Count the holes and the spread in the new top before you buy the faucet.
  • The faucet after the top: Fit the faucet and drain on the bench, before the top goes on.
  • Cranking compression nuts: Hand-tight + ¼ turn. Plastic slip nuts: hand-tight.
  • Not level: Water pools at the back of the top. Level and shim the cabinet.

What the calculator assumes

  • Vanity depth about 21″, height about 34″ with the top (typical).
  • Drain arm about 18–20″ and stops about 20–22″ off the floor (typical): check yours against the drawers.
  • Supply lines: two per sink, 20″ braided; trap: 1¼ in.
  • Silicone: about 9 ft at a 3/16″ bead.
  • Paid work: many places license plumbers for fixture work too — check the rules where you work before you quote a swap.
Plumbing · Sheet S-33 · 05Code, permits and safety

Code, permits and safety

The Sheet sets its code notes for the job's state or province. These are New Jersey's and Ontario's; the code reference has more. Always confirm with your building department.

  • Room around the fixtures: Codes ask for about 15″ from the center of a toilet or sink to a wall or the next fixture, and 21″ clear in front (IRC R307.1; R327 in the 2024 IRC).
Plumbing · Sheet S-33 · 06Questions

Questions

What materials do I need to replace a bathroom vanity?

For the worked example, a 30″ vanity, the Sheet counts 9 lines with waste included, starting with vanity with top, 30″ (1 vanity), bathroom faucet, basic (1 faucet), p-trap kit, 1¼ in (1 kit), faucet supply line, braided (2 lines). Each line's math is in the table above. Put in your own sizes in the vanity calculator and every line is counted again.

How long does it take to replace a bathroom vanity, and can I do it myself?

About 3 to 5 hours for the worked example, in 9 steps. StudSheet stamps it DIY OK: you can do this.

What tools do I need to replace a bathroom vanity?

15 in all. The must-haves start with basin wrench, tongue-and-groove pliers, hacksaw, 4-ft level, stud finder, cordless drill/driver. On the Sheet you mark each one as owned, to buy or to rent.

Plumbing · Sheet S-33 · 07Ask about it

Ask about it

Stuck while you replace a bathroom vanity? Ask in the Vanities and sinks group of the StudSheet community with this Sheet attached. Homeowners who've done it and verified pros answer, and anyone can read it.

Plumbing · Sheet S-33 · 08More plumbing Sheets

More plumbing Sheets

  • Plumbing for contractors: run this takeoff at your own prices, send the estimate, and get it signed and the deposit paid.
  • Plumbing rough-in (3 fixtures): For plumbers: supply and drain pipe by size, fittings, valves and vents for the fixtures you are adding.
  • Water heater replacement (Gas water heater, 4 people): For plumbers: tank or tankless, venting, expansion tank, relief line, connections and the permit.
  • Replace a toilet (Toilet, 12″ rough-in): Measure the rough-in, pick a toilet that fits, and swap it with a new seal, bolts and supply line — plus what to do about a broken flange.
  • Replace a faucet (Kitchen faucet): A kitchen or bathroom faucet that fits your sink’s holes, new supply lines, the right sealant, and a leak check — or a cartridge for a drip.
  • All 45 Sheets, across 16 trades.
  • Code reference: frost depths, guard heights, stairs, retaining walls.

Get the Sheet.

Open StudSheet
Coming soon on theApp StoreComing soon onGoogle Play