Sheet S-08 · Finish a basement
28′ × 25′ basement
- Area
- 657sq ft finished
- Studs
- 1082×4, all walls
- Drywall
- 364×8 sheets
- Ceiling
- 1882×2 panels
Tools you need
- Hygrometer
- Tape measure (25 ft)
- Carpenter's pencil
- Chalk line
- Speed square
- 4-ft level
41 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 30 sheets | Rigid foam board 1″ (R-5)4×8 sheets | 848 sq ft of foundation wall (106′ × 8′) + 10% for cuts ÷ 32 sq ft per sheet. |
| 26 tubes | Foamboard adhesive10 oz tube | 3/16″ beads about 9″ apart (makers say 6–12″) = about 43 ft of bead per 4×8 sheet × 30 sheets + 10%. A 10 oz tube lays about 55 ft of 3/16″ bead. Brace the boards or use cap fasteners until the adhesive cures — follow your adhesive’s label. |
| 238 ft | Foam board seam tape | A vertical seam every 4 ft + 10%. |
| 4 cans | Spray foam, gaps and cracks12 oz cans | Corners, pipe holes and the gap at the top of the foam. |
| 4 cans | Fireblock sealant (fire-rated foam)12 oz can | Top of the wall cavities where they meet the joists, and around soffits and pipe holes (IRC R302.11) — about 30 ft per can. |
| 93 studs | 2×42×4 × 8′ | 84 studs at 16″ on center along 4 foundation walls (28′ + 25′ + 28′ + 25′), one at each end of every wall + 10% for warped boards. Cut to about 93″. |
| 8 boards | Pressure-treated 2×4treated 2×4 × 16′ | Pressure-treated because it sits on the slab (IRC decay protection). One continuous plate per wall, joined over a stud on long walls. |
| 8 boards | 2×42×4 × 16′ | Single top plate fastened to the joists or to blocking between them. |
| 5 boards | 2×42×4 × 8′, cut to 14½″ | 28 blocks between the joists above the walls that run parallel to them, one every 24″, so the top plate has wood to grab. |
| 15 studs | 2×42×4 × 8′ | New interior walls, 12′ long: Layout: 10 studs at 16″ on center over 12′ − 2 replaced at the door opening + 2 king + 2 jack + 1 cut into a header and 2 cripples = 13. Plus 10% for warped boards. Cut each stud to fit (about 93″). |
| 1 board | Pressure-treated 2×4treated 2×4 × 12′ | New interior walls, 12′ long: One continuous plate for 12′. Pressure-treated because it sits on a concrete slab (IRC decay protection). Cut it out inside the doorway after the wall is fastened. |
| 1 board | 2×42×4 × 12′ | New interior walls, 12′ long: Single top plate — the IRC allows one on non-bearing interior walls. |
| ≈702 screws (8 boxes of 100) | 3″ framing screws#9 or #10, exterior-rated | 4 per stud, plus top-plate fastening to joists or blocking, for every new wall. With a framing nailer, use 16d nails instead. |
| 67 pins (1 pack of 100) | Powder-actuated pins + loads2½″ pins + .27-cal loads | Bottom plates pinned to the slab: one every 24″ and near each end. (Or pre-drill and use concrete screws.) |
| 5 tubes | Construction adhesive10 oz tube | A ¼″ bead under every bottom plate on concrete — about 25 ft per tube. |
| 13 boxes | Electrical boxesper your electrician | 10 outlets + 3 switch locations (one per 6 lights and one by each door). Cable size and circuits are the electrician’s call. |
| 10 lights | Recessed LED lightsdrop-ceiling rated | Your count. About one per 50–70 sq ft gives even light in a basement (66 sq ft each here). |
| 764 sq ft (buy by the coverage printed on the bag) | Unfaced fiberglass batts R-13, 15″ wideunfaced, 15″ × 93″ | 848 sq ft of framed wall minus about 10% for studs and plates. |
| 36 sheets | Moisture-resistant drywall ½″4×8 sheets | 848 sq ft of foundation walls + 153 sq ft of partitions (both sides, doors removed) + 12% for cuts ÷ 32 sq ft per sheet. It also covers the foam, which the IRC requires (½″ drywall over foam plastic). |
| ≈1109 screws (5 lb boxes) | Drywall screws, coarse thread1¼″ coarse thread | 7 studs or joists behind each sheet × 4 screws per stud on walls (16″ apart) and 5 per joist on ceilings (12″ apart), USG spacing, + 10%. About 250 per lb. |
| 3 pails | All-purpose joint compound4.5-gal pail (≈62 lb) | 10 gal: about 10 gal per 1,000 sq ft of board (USG), three coats. |
| 2 rolls | Paper joint tape250 ft roll | 370 ft: about 370 ft per 1,000 sq ft of board (USG). |
| 12 pieces | Wall molding, 12 ft | 126′ 8″ of wall (both sides of the partitions too — the grid stops at each one) + 5% ÷ 12 ft. |
| 15 pieces | Main beam, 12 ft | 6 main-beam lines, 4 ft apart and centered so the border panels match on both sides, × 27′ 2″ each + 5%, spliced — start each line with the leftover from the last. |
| 91 pieces | Cross tee, 4 ft | 13 rows of tees, 2 ft apart, × 7 tees per row (border tees are cut from full ones). |
| 84 pieces | Cross tee, 2 ft | One in the middle of each 2×4 opening to make 2×2 openings. |
| 188 panels (border panels are cut from full ones) | Ceiling panels2×2 | 13 × 14 openings, counting every cut border opening as a full panel, plus a cut row along the partitions. Buy 2–3 spares. |
| 48 hangers | Grid hanger hooks (or 12-ga wire + eye screws)hooks or wire | One every 4 ft along each main line plus one at each end — never more than 4 ft apart. |
| ≈95 screws (1 box of 100) | Self-tapping screws #8 × 1″ | One into every stud the wall molding crosses (16″ apart). |
| 37 boxes | Luxury vinyl plank (LVP)≈20 sq ft per box (check yours) | 657 sq ft + 10% for cuts ÷ 20 sq ft per box. Use the coverage printed on your box. |
| 1 pack | Expansion spacers ¼″ | Hold the ¼″ expansion gap at every wall. |
| 1 door | Pre-hung interior door32″, to match the rough opening | One per opening framed in the partitions. |
| 6 pieces | Door casing, 7 ft7 ft lengths | Three pieces per side, two sides per door. |
| 1 bundle | Wood shimsbundle of about 40 | Behind each hinge and the latch: about 8 per door, so a bundle does 5 doors. |
| 18 pieces | Baseboard8 ft lengths | 124 ft along the finished walls and both sides of the partitions (doors removed) + 10% for miters. Nail it to the wall, never through the floating floor. |
| 1 five-gallon bucket | Drywall primer (PVA)1 coat | 1001 sq ft of new drywall ÷ 300 sq ft/gal = 3.34 gal. New drywall needs PVA primer so the paint dries evenly. |
| 1 five-gallon bucket + 1 gallon | Wall painteggshell, 2 coats | 1001 sq ft × 2 coats ÷ 350 sq ft/gal = 5.72 gal. |
| 3 tubes | Painter’s acrylic caulk (paintable) | Top edge of baseboard and casing — about 50 ft per tube. |
| 1 alarm | Combination smoke + CO alarmhardwired or 10-year sealed, per your inspector | One on the basement level (IRC R314, R315; R310 and R311 in the 2024 IRC). Hardwired alarms go in at the electrical rough-in. |
Sheet S-08 · Finish a basement
8.53 m × 7.62 m basement
- Area
- 61.0m² finished
- Studs
- 1082×4, all walls
- Drywall
- 364×8 sheets
- Ceiling
- 1882×2 panels
Tools you need
- Hygrometer
- Tape measure (7.5 m)
- Carpenter's pencil
- Chalk line
- Speed square
- 1.2 m level
41 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 30 sheets | Rigid foam board 25 mm (R-5)4×8 sheets | 78.8 m² of foundation wall (32.31 m × 2.44 m) + 10% for cuts ÷ 3.0 m² per sheet. |
| 26 tubes | Foamboard adhesive300 mL tube | 5 mm beads about 229 mm apart (makers say 152–305 mm) = about 13.11 m of bead per 4×8 sheet × 30 sheets + 10%. A 300 mL tube lays about 16.76 m of 5 mm bead. Brace the boards or use cap fasteners until the adhesive cures — follow your adhesive’s label. |
| 72.54 m | Foam board seam tape | A vertical seam every 1.22 m + 10%. |
| 4 cans | Spray foam, gaps and cracks340 g cans | Corners, pipe holes and the gap at the top of the foam. |
| 4 cans | Fireblock sealant (fire-rated foam)340 g can | Top of the wall cavities where they meet the joists, and around soffits and pipe holes — about 9.14 m per can. |
| 93 studs | 2×42×4 × 2.44 m | 84 studs at 406 mm on center along 4 foundation walls (8.53 m + 7.62 m + 8.53 m + 7.62 m), one at each end of every wall + 10% for warped boards. Cut to about 2.36 m. |
| 8 boards | Pressure-treated 2×4treated 2×4 × 4.88 m | Pressure-treated because it sits on the slab. One continuous plate per wall, joined over a stud on long walls. |
| 8 boards | 2×42×4 × 4.88 m | Single top plate fastened to the joists or to blocking between them. |
| 5 boards | 2×42×4 × 2.44 m, cut to 368 mm | 28 blocks between the joists above the walls that run parallel to them, one every 610 mm, so the top plate has wood to grab. |
| 15 studs | 2×42×4 × 2.44 m | New interior walls, 3.66 m long: Layout: 10 studs at 406 mm on center over 3.66 m − 2 replaced at the door opening + 2 king + 2 jack + 1 cut into a header and 2 cripples = 13. Plus 10% for warped boards. Cut each stud to fit (about 2.36 m). |
| 1 board | Pressure-treated 2×4treated 2×4 × 3.66 m | New interior walls, 3.66 m long: One continuous plate for 3.66 m. Pressure-treated because it sits on a concrete slab. Cut it out inside the doorway after the wall is fastened. |
| 1 board | 2×42×4 × 3.66 m | New interior walls, 3.66 m long: Single top plate: building codes usually allow one on a non-bearing interior wall — ask your building department. |
| ≈702 screws (8 boxes of 100) | 76 mm framing screws#9 or #10, exterior-rated | 4 per stud, plus top-plate fastening to joists or blocking, for every new wall. With a framing nailer, use 16d nails instead. |
| 67 pins (1 pack of 100) | Powder-actuated pins + loads64 mm pins + .27-cal loads | Bottom plates pinned to the slab: one every 610 mm and near each end. (Or pre-drill and use concrete screws.) |
| 5 tubes | Construction adhesive300 mL tube | A 6 mm bead under every bottom plate on concrete — about 7.62 m per tube. |
| 13 boxes | Electrical boxesper your electrician | 10 outlets + 3 switch locations (one per 6 lights and one by each door). Cable size and circuits are the electrician’s call. |
| 10 lights | Recessed LED lightsdrop-ceiling rated | Your count. About one per 4.6–6.5 m² gives even light in a basement (6.1 m² each here). |
| 10 bags (7.3 m² each) | Batts R-14 (or R-12), 381 × 1194 mmR-14 (R-12 also fits 2×4), 381 × 1194 mm | 78.8 m² of framed wall minus about 10% for studs and plates = 71.0 m². Batts 1.19 m long, two per 2.44 m stud bay; a bag of 381 mm × 1.19 m R-14 covers 7.3 m² — check yours. |
| 36 sheets | Moisture-resistant drywall 13 mm4×8 sheets | 78.8 m² of foundation walls + 14.2 m² of partitions (both sides, doors removed) + 12% for cuts ÷ 3.0 m² per sheet. It also covers the foam: codes require a thermal barrier over foam plastic. |
| ≈1109 screws (2.3 kg) | Drywall screws, coarse thread32 mm coarse thread | 7 studs or joists behind each sheet × 4 screws per stud on walls (406 mm apart) and 5 per joist on ceilings (305 mm apart), USG spacing, + 10%. About 550 per kg. |
| 3 pails | All-purpose joint compound17 L pail (≈28 kg) | 37.9 L: about 1 L per 2.5 m² of board (USG), three coats. |
| 2 rolls | Paper joint tape76.2 m roll | 112.89 m: about 1.2 m per m² of board (USG). |
| 12 pieces | Wall molding, 3.66 m | 38.61 m of wall (both sides of the partitions too — the grid stops at each one) + 5% ÷ 3.66 m. |
| 15 pieces | Main beam, 3.66 m | 6 main-beam lines, 1.22 m apart and centered so the border panels match on both sides, × 8.28 m each + 5%, spliced — start each line with the leftover from the last. |
| 91 pieces | Cross tee, 1.22 m | 13 rows of tees, 610 mm apart, × 7 tees per row (border tees are cut from full ones). |
| 84 pieces | Cross tee, 610 mm | One in the middle of each 2×4 opening to make 2×2 openings. |
| 188 panels (border panels are cut from full ones) | Ceiling panels2×2 | 13 × 14 openings, counting every cut border opening as a full panel, plus a cut row along the partitions. Buy 2–3 spares. |
| 48 hangers | Grid hanger hooks (or 12-ga wire + eye screws)hooks or wire | One every 1.22 m along each main line plus one at each end — never more than 1.22 m apart. |
| ≈95 screws (1 box of 100) | Self-tapping screws #8 × 25 mm | One into every stud the wall molding crosses (406 mm apart). |
| 37 boxes | Luxury vinyl plank (LVP)≈1.9 m² per box (check yours) | 61.0 m² + 10% for cuts ÷ 1.9 m² per box. Use the coverage printed on your box. |
| 1 pack | Expansion spacers 6 mm | Hold the 6 mm expansion gap at every wall. |
| 1 door | Pre-hung interior door813 mm, to match the rough opening | One per opening framed in the partitions. |
| 6 pieces | Door casing, 2.13 m2.13 m lengths | Three pieces per side, two sides per door. |
| 1 bundle | Wood shimsbundle of about 40 | Behind each hinge and the latch: about 8 per door, so a bundle does 5 doors. |
| 18 pieces | Baseboard2.44 m lengths | 37.80 m along the finished walls and both sides of the partitions (doors removed) + 10% for miters. Nail it to the wall, never through the floating floor. |
| 1 × 18.9 L | Drywall primer (PVA)1 coat | 93.0 m² of new drywall ÷ 27.9 m² per 3.78 L = 12.6 L. New drywall needs PVA primer so the paint dries evenly. |
| 1 × 18.9 L + 1 × 3.78 L | Wall painteggshell, 2 coats | 93.0 m² × 2 coats ÷ 32.5 m² per 3.78 L = 21.7 L. |
| 3 tubes | Painter’s acrylic caulk (paintable) | Top edge of baseboard and casing — about 15.24 m per tube. |
| 1 alarm | Combination smoke + CO alarmhardwired or 10-year sealed, per your inspector | One on the basement level. Hardwired alarms go in at the electrical rough-in. |