Sheet S-10 · Addition shell
16′ × 12′ addition
- Floor area
- 192sq ft, 1 story
- Concrete
- 4.75cu yd
- Studs
- 632×6 × 92-5/8″
- Sheathing
- 28sheets, walls + roof + floor
Tools you need
- Tape measure (25 ft)
- Mason's line + stakes
- Square shovel
- Wheelbarrow
- Rebar cutter-bender
- Chalk line
47 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 1 survey | Survey or plot planboundary and the new footprint | Zoning (setbacks, lot coverage, height) and the permit office work from it, and it places the footings. |
| 1 set | Plans and engineeringdrawings, engineering, energy forms | Architect or designer drawings, the engineer’s foundation and beam details, and the energy compliance for zone 4. |
| 1 permit | Building permit and plan reviewwith plan review and inspections | An addition needs a construction permit from your town’s construction office, usually with drawings sealed by a licensed architect or engineer, and zoning first (setbacks, lot coverage, height). Plan review takes weeks. The electrical, plumbing and HVAC work goes on the licensed trades’ own permits. |
| 1 haul | Dumpster (20-yard roll-off) | Framing offcuts, packaging, roofing and drywall scraps, and the old siding along the house: about one 20-yard haul per 400 sq ft of new floor. Spoil from the dig goes by truck, not in the dumpster. The dig: about 25.3 cu yd out, 11.2 cu yd back in as backfill, ≈17.7 cu yd loose to truck away (25% swell). |
| 1.5 cu yd (one pour) | Ready-mix concrete (delivered)16″ × 8″ continuous footing, strength per the plans (psi) | 40′ of footing × 16″ wide × 8″ thick = 1.32 cu yd, + 10% for the trench’s uneven bottom = 1.45 cu yd, ordered up to the next quarter. The IRC asks at least 12″ × 6″, projecting 2″ or more past the wall and no more than its thickness (R403.1.1); Table R403.1(1) sets the width for your soil, stories and snow load. |
| 5 bars | Rebar #4 (½″)#4 × 20′ | Two continuous #4 bars in the footing (80 ft + 10% for laps and corners). Required in seismic areas and common everywhere — follow the plans. |
| 20 dobies | Rebar chairs or dobies3″ dobies | One every 4 ft under each bar: steel cast against the ground needs 3″ of concrete under it (ACI 318). |
| 3.25 cu yd (one pour) | Ready-mix concrete (delivered)8″ poured wall, 3′ tall, strength per the plans (psi) | 40′ × 8″ × 3′ = 2.96 cu yd, + 5% = 3.11 cu yd. Forms by the foundation crew or rented panels. Top of wall 8″ above finished grade (IRC R404.1.6 asks 6″ or more). |
| 10 bolts | Anchor bolts ½″ × 10″, nut and washer½″ × 10″ J-bolts | Set in the wet concrete (or grouted cores) under the sill: ½″ bolts, 7″ into the concrete, no more than 6 ft apart, at least two per plate piece with one within 12″ of each end (IRC R403.1.6). High-wind and seismic areas add plate washers and hold-downs per the plans. |
| 1 pail | Foundation dampproofing, 5-gal pail5-gal, about 125 sq ft a pail | 93 sq ft of wall below grade (40′ × 2′ 4″), from the footing to the finished grade (IRC R406). |
| 1 roll | Rebar tie wire16-gauge roll | Ties the bar laps, the corners and the mesh laps. |
| 203 sq ft | Polyethylene sheeting (vapor retarder)Class I, laps 6″, taped | 166 sq ft of crawlspace ground + 10% for laps, plus 6″ up the walls. IRC R408 (the vented exception and the sealed crawlspace both start here). |
| 3 vents | Foundation vent 8″ × 16″8″ × 16″, about 45 sq in free area | One within 3 ft of each outside corner (2) plus one more for cross-flow; with the ground covered by a Class I vapor retarder the vents may total 1/1,500 of the crawlspace (IRC R408.2). |
| 1 door | Crawlspace access door16″ × 24″ or larger | Access to the crawlspace: at least 16″ × 24″ through the wall or 18″ × 24″ through the floor (IRC R408.4). |
| 1 roll | Sill sealer gasket, 5½″ × 50 ft5½″ × 50′ roll | 40 ft of sill, 50 ft a roll. |
| 2 boards | Pressure-treated 2×6treated 2×6 × 12′ | Pressure-treated sill on the gasket, bolted down; one piece per wall up to 16 ft (wood on concrete must be treated, IRC R317.1; R304 in the 2024 IRC). |
| 1 board | Pressure-treated 2×6treated 2×6 × 16′ | Pressure-treated sill on the gasket, bolted down; one piece per wall up to 16 ft (wood on concrete must be treated, IRC R317.1; R304 in the 2024 IRC). |
| 13 joists | 2×10 framing lumber2×10 × 12′ | 13 joists at 16″ on center along 16′, running out from the house, about 11′ 4″ clear. Check the size against IRC Table R502.3.1(2) for your species and grade, or have the engineer add a girder to cut the span. |
| 2 boards | 2×10 framing lumber2×10 × 16′ | 16 ft of rim + 5%, in 16 ft boards. |
| 1 board | 2×10 framing lumber2×10 × 16′ | Along the house’s band joist (16′), with the siding off and flashed above. The house’s framing must carry it and the engineer sets the fastening. |
| 26 screws (about) | Structural ledger screwsper the engineer’s schedule | Two every 16″ along the ledger is a common pattern; use the engineer’s. |
| 13 hangers | Joist hangersfor 2×10 | One per joist at the ledger. |
| 2 boxes | Joist hanger nails (10d × 1½″)10d × 1½″, 1 lb box | About 10–12 nails per hanger; every hole filled. |
| 7 sheets | Subfloor ¾″ tongue-and-groove, 4×823/32″ T&G, 4×8 | 192 sq ft + 8% for cuts ÷ 32 sq ft a sheet, long edges across the joists. |
| 4 tubes | Subfloor adhesive, 28 oz tube28 oz tubes | About 36 ft of ¼″ bead per sheet (every joist and the groove), about 80 ft a tube. |
| 63 studs | 2×62×6 × 92-5/8″ precut | Layout 33 (40′ of wall at 16″ on center, one at each end of each wall) + 4 at the corners + 16 kings and jacks at 4 openings + 4 at the opening into the house = 57, + 10% for crooked boards. Studs in the openings become cripples. 92-5/8″ precuts make a 8′ 1-1/8″ wall with a bottom plate and a double top plate. |
| 6 boards | 2×62×6 × 12′ | A bottom plate and a double top plate, top-plate joints lapped 24″ or more (IRC R602.3.2). |
| 3 boards | 2×62×6 × 16′ | A bottom plate and a double top plate, top-plate joints lapped 24″ or more (IRC R602.3.2). |
| 4 headers | Header stock (built-up 2× or LVL)size per IRC Table R602.7(1) or (2) or the engineer | 3 windows (36″ rough openings), 1 door. Outside walls carry the roof, so each header is sized for its span and load: confirm every one. |
| 1 header + temporary shoring | Header for the opening into the housesized by the engineer, for a 36″ opening | The house wall usually carries a floor or the roof: the engineer sizes the header (or beam), its posts and what they bear on. Shore the house before you cut. |
| 12 sheets | Wall sheathing 7/16″ OSB, 4×8 | 40′ of outside wall × 8′ 11-1/8″ (walls and floor bands) + 32 sq ft of gable = 389 sq ft, − 67 sq ft of openings, + 10% for cuts ÷ 32 sq ft a sheet. Nailed 6″ on the edges, 12″ in the field, or as the bracing plan says (IRC R602.10). |
| 5 trusses | Roof truss (ordered)common 6/12 × 16′ span, 12″ heels | 7 trusses at 24″ on center along 12′, 2 of them gable ends. The truss maker designs them for your span, pitch, overhang and snow load (IRC R802.10, ANSI/TPI 1) and sends the drawings and bracing plan with the delivery. |
| 2 trusses | Gable-end truss (ordered)gable end × 16′ span | One at the far wall and one at the house wall, with vertical studs for the sheathing. |
| 14 ties | Hurricane ties (truss or rafter to plate)model per the truss drawings or the uplift table | One at each end of every truss where it sits on a wall (uplift: IRC R802.11). |
| 9 sheets | Roof sheathing ½″, 4×8½″, 4×8, with clips at 24″ | 262 sq ft of roof (234 sq ft in plan with the overhangs × 1.118 for the 6/12 slope) + 10% for cuts ÷ 32 sq ft. |
| 1 box (≈688 nails) | Framing nails 3¼″ (16d), box of 2,5003¼″ × .131, coil or stick | About 8 nails per framing piece (86 studs, plate boards, joists and roof members), per the fastening schedule (IRC Table R602.3(1)). |
| 1 box (≈1,960 nails) | Sheathing nails 2⅜″ (8d), box of 2,5002⅜″ × .113 (8d) | About 70 per sheet at 6″ on the edges and 12″ in the field: 28 sheets. |
| 9 bundles (3 squares) | Architectural shingles (laminated)3 bundles a square | 262 sq ft of roof + 10% waste (gable) = 2.88 squares × 3 bundles. |
| 1 bundle | Starter strip shinglesabout 100 ft a bundle | 26 ft of eaves. |
| 1 bundle | Hip and ridge cap shinglesabout 25 ft a bundle | 13 ft of ridge. |
| 1 roll | Synthetic roof underlayment10 squares a roll | 262 sq ft + 10% for laps ÷ 1000 sq ft. |
| 5 pieces | Drip edge10 ft pieces | 26 ft of eaves + 20 ft of rakes + 5% for laps (drip edge at eaves and rakes, IRC R905.2.8.5). |
| 1 box | Roofing nails, coil1¼″ coil, box of 7,200 | Four nails per shingle, about 320 a square: ≈921. |
| 51 pieces | Step flashing5″ × 7″ pieces (or as your shingles ask) | One per shingle course (5″) up both slopes where they meet the house wall: 20′ 1-1/2″. The house’s wrap and siding lap over them. |
| 2 kick-outs | Kick-out flashingleft and right | At the bottom of each roof-to-wall line, so water goes into the gutter, not behind the siding. |
| 3 sections | Shingle-over ridge vent4 ft sections | Along the ridge, stopping about 12″ from each end, with vented soffits for the intake — attic venting (IRC R806). |
| 12 baffles | Attic baffles (rafter vents)one per bay at each eave | Keep the attic insulation off the soffit vents: 12 bays. |
| 1 roll | House wrap, 9 ft × 150 ft roll | 389 sq ft of wall + 15% for laps ÷ 1350 sq ft a roll. Lapped like shingles, top over bottom (water-resistive barrier, IRC R703.2). |
| 1 roll | House wrap tape1⅞″ × 165 ft | Seams and cuts in the wrap. |
| 1 box | Plastic cap nailsfor the wrap (or cap staples) | About one box per 1500 sq ft of wrap. |
| 1 roll | Window and door flashing tape, 4″ × 75 ft | 65 ft around the rough openings (sill, jambs, head) + 15% for laps (flashing at openings, IRC R703.4). |
| 3 windows | Window, new construction (nailing fin)36″ × 60″ rough opening, U-0.30 or lower, SHGC 0.40 or lower | Your count and average size. Energy rule for zone 4: U-0.30 or lower, SHGC 0.40 or lower. Sleeping rooms need one egress window (IRC R310; R319 in the 2024 IRC). |
| 1 door | Exterior door, 36″ pre-hung36″, rough opening 38″ × 82-1/2″ | Your count, pre-hung with the sill. |
| 1 pan | Door sill panto the door width | One under each exterior door. |
| 2 tubes | Exterior sealant (paintable)10 oz tubes | The two vertical joints where the new walls meet the house (8′ 11-1/8″ each), about 25 ft a tube, + one for the penetrations. |
| 2 boxes | Vinyl siding (box of 2 squares)2 squares a box | 322 sq ft of wall (openings out) + 10% = 355 sq ft ÷ 200 sq ft a box. |
| 129 ft | Siding trim (starter, J-channel, corners)starter, J-channel, corner posts | Corners (18 ft), around the openings (65 ft) and under the eaves and rakes. |
| 1 box | Siding nails, galvanized (box)galvanized, through any foam into the framing | About one 5 lb box per 8 squares. |
| 47 ft | Soffit and fasciavented soffit at the eaves, fascia all around | 26 ft of eaves + 20 ft of rakes. |
| allowance for 192 sq ft | Electrical — allowanceby the licensed electrician | Circuits, outlets, lights, smoke and CO alarms for 192 sq ft of new floor. A placeholder until the electrician’s quote — a panel upgrade, if needed, is extra. |
| allowance for 192 sq ft | Heating and cooling — allowanceby the HVAC contractor | Heating and cooling for 192 sq ft: extended ducts or a ductless unit, sized by a load calculation. |
| 219 sq ft (buy by the coverage on the bag) | Wall batts for 2×6 (R-19 to R-24)R-21, kraft-faced, 15″ wide | 40′ of outside wall × 8′ 1-1/8″ − openings, less 15% for the framing. Planned with R-21 batts + R-5 continuous foam for zone 4 (R-30, R-20 + R-5 continuous, R-13 + R-10 continuous, or R-20 continuous, IECC 2021 Table R402.1.3). |
| 10 sheets | Exterior rigid foam 1″ (R-5), 4×81″ (R-5), seams taped | Over the wall sheathing, under the wrap: 290 sq ft of wall (openings out, the attic gable left bare) + 10% ÷ 32 sq ft. Window and door jambs get extension jambs. |
| 202 sq ft at R-60 | Blown-in attic insulationR-60 (about 22″ of loose fill — read the bag chart) | 192 sq ft of top-floor ceiling + 5% at the heels. R-60 (IECC 2021 Table R402.1.3). |
| 173 sq ft (by the bag’s coverage) | Floor batts (R-13 to R-38)R-19, with supports | 192 sq ft of floor over the vented crawlspace, less 10% for the joists. R-19 (IECC 2021 Table R402.1.3). |
| 2 cans | Spray foam, gaps and cracks12 oz cans | Air-sealing the plates, the rim, the window shims and the wire and pipe holes: about one can per 25 ft of wall per story. |
| 2 cans | Fireblock sealant (fire-rated foam)12 oz cans | Fire-rated foam at the top plates and floor penetrations (fireblocking, IRC R302.11). |
| 9 sheets | Drywall ½″½″, 4×12 sheets | (40′ of outside wall + 16′ along the house) × 8′, − openings = 361 sq ft + 12% for cuts ÷ 48 sq ft. |
| 5 sheets | Drywall ½″ ceiling board (sag-resistant)½″ ceiling board, 4×12 sheets | 192 sq ft + 12% ÷ 48 sq ft. Sag-resistant board for framing 24″ apart with insulation on top. |
| ≈589 screws (3 lb) | Drywall screws, coarse thread1¼″ coarse thread | USG spacing: 4 per stud on walls (16″ apart), 5 per joist or truss on ceilings (12″ apart), + 10%. About 250 per lb. |
| 2 pails | All-purpose joint compound4.5-gal pail (≈62 lb) | 5.5 gal: about 10 gal per 1,000 sq ft of board (USG), three coats. |
| 1 roll | Paper joint tape250 ft roll | 204 ft: about 370 ft per 1,000 sq ft of board (USG). |
Sheet S-10 · Addition shell
4.88 m × 3.66 m addition
- Floor area
- 17.8m², 1 story
- Concrete
- 4.5m³
- Studs
- 632×6 × 2.35 m
- Sheathing
- 28sheets, walls + roof + floor
Tools you need
- Tape measure (7.5 m)
- Mason's line + stakes
- Square shovel
- Wheelbarrow
- Rebar cutter-bender
- Chalk line
47 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 1 survey | Survey or plot planboundary and the new footprint | Zoning (setbacks, lot coverage, height) and the permit office work from it, and it places the footings. |
| 1 set | Plans and engineeringdrawings, engineering, energy forms | Architect or designer drawings, the engineer’s foundation and beam details, and the energy compliance for NBC zone 6. |
| 1 permit | Building permit and plan reviewwith plan review and inspections | An addition needs a building permit from your municipality’s building department, usually with drawings by an architect, an engineer or a qualified designer, and zoning first (setbacks, lot coverage, height). Plan review takes weeks. The electrical, plumbing, gas and HVAC work goes to licensed trades with their own permits. Confirm with your building department. |
| 1 haul | Dumpster (20-yard roll-off) | Framing offcuts, packaging, roofing and drywall scraps, and the old siding along the house: about one 20-yard haul per 37.2 m² of new floor. Spoil from the dig goes by truck, not in the dumpster. The dig: about 22.91 m³ out, 11.39 m³ back in as backfill, ≈14.40 m³ loose to truck away (25% swell). |
| 1.25 m³ (one pour) | Ready-mix concrete (delivered)406 mm × 203 mm continuous footing, strength per the plans (MPa) | 12.19 m of footing × 406 mm wide × 203 mm thick = 1.01 m³, + 10% for the trench’s uneven bottom = 1.11 m³, ordered up to the next quarter. NBC Table 9.15.3.4: at least 250 mm wide under one floor, 350 mm under two, and as thick as the projection (100 mm minimum) — size it for your soil. |
| 5 bars | Rebar #4 (13 mm)#4 × 6.10 m | Two continuous #4 bars in the footing (24.38 m + 10% for laps and corners). Required in seismic areas and common everywhere — follow the plans. |
| 20 dobies | Rebar chairs or dobies76 mm dobies | One every 1.22 m under each bar: steel cast against the ground needs 76 mm of concrete under it (ACI 318). |
| 3.25 m³ (one pour) | Ready-mix concrete (delivered)203 mm poured wall, 1.20 m tall, strength per the plans (MPa) | 12.19 m × 203 mm × 1.20 m = 2.97 m³, + 5% = 3.12 m³. Forms by the foundation crew or rented panels. Top of wall 203 mm above finished grade. |
| 9 bolts | Anchor bolts 13 × 254 mm, nut and washer12.7 mm × 254 mm J-bolts | Set in the wet concrete (or grouted cores) under the sill: at least 12.7 mm (13 mm) bolts, no more than 2.4 m apart, within 0.5 m of each end, embedded 100 mm or more (NBC 9.23.6.1). High-wind and seismic areas add plate washers and hold-downs per the plans. |
| 2 pails | Foundation dampproofing, 18.9 L pail18.9 L, about 11.6 m² a pail | 12.2 m² of wall below grade (12.19 m × 997 mm), from the footing to the finished grade. |
| 1 roll | Rebar tie wire16-gauge roll | Ties the bar laps, the corners and the mesh laps. |
| 18.9 m² | Polyethylene sheeting (vapor retarder)Class I, laps 152 mm, taped | 15.4 m² of crawlspace ground + 10% for laps, plus 152 mm up the walls. Covers the ground so it doesn’t feed moisture to the floor. |
| 3 vents | Foundation vent 203 × 406 mm203 × 406 mm, about 290 cm² free area | One within 914 mm of each outside corner (2) plus one more for cross-flow; with the ground covered by a Class I vapor retarder the vents may total 1/1,500 of the crawlspace. |
| 1 door | Crawlspace access door406 × 610 mm or larger | Access to the crawlspace: at least 406 × 610 mm through the wall or 457 × 610 mm through the floor. |
| 1 roll | Sill sealer gasket, 140 mm × 15.24 m140 mm × 15.24 m roll | 12.19 m of sill, 15.24 m a roll. |
| 2 boards | Pressure-treated 2×6treated 2×6 × 3.66 m | Pressure-treated sill on the gasket, bolted down; one piece per wall up to 4.88 m. |
| 1 board | Pressure-treated 2×6treated 2×6 × 4.88 m | Pressure-treated sill on the gasket, bolted down; one piece per wall up to 4.88 m. |
| 13 joists | 2×10 framing lumber2×10 × 3.66 m | 13 joists at 406 mm on center along 4.88 m, running out from the house, about 3.45 m clear. Check the size against the NBC span tables (9.23.4.2), or have the engineer add a girder to cut the span. |
| 2 boards | 2×10 framing lumber2×10 × 4.88 m | 4.88 m of rim + 5%, in 4.88 m boards. |
| 1 board | 2×10 framing lumber2×10 × 4.88 m | Along the house’s band joist (4.88 m), with the siding off and flashed above. The house’s framing must carry it and the engineer sets the fastening. |
| 26 screws (about) | Structural ledger screwsper the engineer’s schedule | Two every 406 mm along the ledger is a common pattern; use the engineer’s. |
| 13 hangers | Joist hangersfor 2×10 | One per joist at the ledger. |
| 2 boxes | Joist hanger nails (10d × 38 mm)10d × 38 mm, 0.5 kg box | About 10–12 nails per hanger; every hole filled. |
| 7 sheets | Subfloor 19 mm tongue-and-groove, 4×818 mm T&G, 4×8 | 17.8 m² + 8% for cuts ÷ 3.0 m² a sheet, long edges across the joists. |
| 4 tubes | Subfloor adhesive, 828 mL tube828 mL tubes | About 10.97 m of 6 mm bead per sheet (every joist and the groove), about 24.38 m a tube. |
| 63 studs | 2×62×6 × 2.35 m precut | Layout 33 (12.19 m of wall at 406 mm on center, one at each end of each wall) + 4 at the corners + 16 kings and jacks at 4 openings + 4 at the opening into the house = 57, + 10% for crooked boards. Studs in the openings become cripples. 2.35 m precuts make a 2.47 m wall with a bottom plate and a double top plate. |
| 6 boards | 2×62×6 × 3.66 m | A bottom plate and a double top plate, top-plate joints lapped 610 mm or more (NBC 9.23.11). |
| 3 boards | 2×62×6 × 4.88 m | A bottom plate and a double top plate, top-plate joints lapped 610 mm or more (NBC 9.23.11). |
| 4 headers | Header stock (built-up 2× or LVL)size per NBC Tables 9.23.12.3 or the engineer | 3 windows (914 mm rough openings), 1 door. Outside walls carry the roof, so each header is sized for its span and load: confirm every one. |
| 1 header + temporary shoring | Header for the opening into the housesized by the engineer, for a 914 mm opening | The house wall usually carries a floor or the roof: the engineer sizes the header (or beam), its posts and what they bear on. Shore the house before you cut. |
| 12 sheets | Wall sheathing 11 mm OSB, 4×8 | 12.19 m of outside wall × 2.72 m (walls and floor bands) + 3.0 m² of gable = 36.1 m², − 6.2 m² of openings, + 10% for cuts ÷ 3.0 m² a sheet. Panel thickness and nailing per NBC 9.23.16–9.23.17 or the plans. |
| 5 trusses | Roof truss (ordered)common 6/12 × 4.88 m span, 305 mm heels | 7 trusses at 610 mm on center along 3.66 m, 2 of them gable ends. The truss maker designs them for your span, pitch, overhang and snow load and sends the drawings and bracing plan with the delivery. |
| 2 trusses | Gable-end truss (ordered)gable end × 4.88 m span | One at the far wall and one at the house wall, with vertical studs for the sheathing. |
| 14 ties | Hurricane ties (truss or rafter to plate)model per the truss drawings or the uplift table | One at each end of every truss where it sits on a wall. |
| 9 sheets | Roof sheathing 13 mm, 4×813 mm, 4×8, with clips at 610 mm | 24.3 m² of roof (21.7 m² in plan with the overhangs × 1.118 for the 6/12 slope) + 10% for cuts ÷ 3.0 m². |
| 1 box (≈688 nails) | Framing nails 83 mm (16d), box of 2,50083 mm × .131, coil or stick | About 8 nails per framing piece (86 studs, plate boards, joists and roof members), per the fastening schedule. |
| 1 box (≈1,960 nails) | Sheathing nails 60 mm (8d), box of 2,50060 mm × .113 (8d) | About 70 per sheet at 152 mm on the edges and 305 mm in the field: 28 sheets. |
| 9 bundles (3 squares) | Architectural shingles (laminated)3 bundles a square | 24.3 m² of roof + 10% waste (gable) = 2.88 squares × 3 bundles. |
| 1 bundle | Starter strip shinglesabout 30.48 m a bundle | 7.92 m of eaves. |
| 1 bundle | Hip and ridge cap shinglesabout 7.62 m a bundle | 3.96 m of ridge. |
| 1 roll | Synthetic roof underlayment10 squares a roll | 24.3 m² + 10% for laps ÷ 92.9 m². |
| 1 roll | Ice and water barrier (self-adhered)914 mm wide, about 18.6 m² a roll | 2 courses along 7.92 m of eaves to reach 610 mm inside the wall line, + a 457 mm strip up the roof-to-wall line = 17.3 m². Expected in your climate. |
| 5 pieces | Drip edge3.05 m pieces | 7.92 m of eaves + 6.13 m of rakes + 5% for laps. |
| 1 box | Roofing nails, coil32 mm coil, box of 7,200 | Four nails per shingle, about 320 a square: ≈921. |
| 51 pieces | Step flashing127 × 178 mm pieces (or as your shingles ask) | One per shingle course (127 mm) up both slopes where they meet the house wall: 6.13 m. The house’s wrap and siding lap over them. |
| 2 kick-outs | Kick-out flashingleft and right | At the bottom of each roof-to-wall line, so water goes into the gutter, not behind the siding. |
| 3 sections | Shingle-over ridge vent1.22 m sections | Along the ridge, stopping about 305 mm from each end, with vented soffits for the intake — attic venting. |
| 12 baffles | Attic baffles (rafter vents)one per bay at each eave | Keep the attic insulation off the soffit vents: 12 bays. |
| 1 roll | House wrap, 2.74 m × 45.72 m roll | 36.1 m² of wall + 15% for laps ÷ 125.4 m² a roll. Lapped like shingles, top over bottom. |
| 1 roll | House wrap tape48 mm × 50.29 m | Seams and cuts in the wrap. |
| 1 box | Plastic cap nailsfor the wrap (or cap staples) | About one box per 139.4 m² of wrap. |
| 1 roll | Window and door flashing tape, 102 mm × 22.86 m | 19.79 m around the rough openings (sill, jambs, head) + 15% for laps. |
| 3 windows | Window, new construction (nailing fin)914 mm × 1.52 m rough opening, U-1.60 W/(m²·K) or lower | Your count and average size. Energy rule for NBC zone 6: U-1.60 W/(m²·K) or lower. Sleeping rooms need one egress window. |
| 1 door | Exterior door, 914 mm pre-hung914 mm, rough opening 965 mm × 2.10 m | Your count, pre-hung with the sill. |
| 1 pan | Door sill panto the door width | One under each exterior door. |
| 2 tubes | Exterior sealant (paintable)300 mL tubes | The two vertical joints where the new walls meet the house (2.72 m each), about 7.62 m a tube, + one for the penetrations. |
| 2 boxes | Vinyl siding (box of 2 squares)2 squares a box | 29.9 m² of wall (openings out) + 10% = 32.9 m² ÷ 18.6 m² a box. |
| 39.32 m | Siding trim (starter, J-channel, corners)starter, J-channel, corner posts | Corners (5.44 m), around the openings (19.79 m) and under the eaves and rakes. |
| 1 box | Siding nails, galvanized (box)galvanized, through any foam into the framing | About one 2.3 kg box per 8 squares. |
| 14.33 m | Soffit and fasciavented soffit at the eaves, fascia all around | 7.92 m of eaves + 6.13 m of rakes. |
| allowance for 17.8 m² | Electrical — allowanceby the licensed electrician | Circuits, outlets, lights, smoke and CO alarms for 17.8 m² of new floor. A placeholder until the electrician’s quote — a panel upgrade, if needed, is extra. |
| allowance for 17.8 m² | Heating and cooling — allowanceby the HVAC contractor | Heating and cooling for 17.8 m²: extended ducts or a ductless unit, sized by a load calculation. |
| 20.3 m² (buy by the coverage on the bag) | Wall batts for 2×6 (R-19 to R-24)R-22, 381 mm wide | 12.19 m of outside wall × 2.47 m − openings, less 15% for the framing. Planned with R-22 batts + R-5 continuous foam for NBC zone 6 (effective RSI 3.08 (R-17.5), or RSI 2.97 with a heat-recovery ventilator, Ontario’s SB-12 (NBC 9.36 values shown)). |
| 10 sheets | Exterior rigid foam 25 mm (R-5), 4×825 mm (R-5), seams taped | Over the wall sheathing, under the wrap: 27.0 m² of wall (openings out, the attic gable left bare) + 10% ÷ 3.0 m². Window and door jambs get extension jambs. |
| 18.8 m² at R-50 | Blown-in attic insulationR-50 (about 432 mm of loose fill — read the bag chart) | 17.8 m² of top-floor ceiling + 5% at the heels. effective RSI 8.67 (R-49.2) (Ontario’s SB-12 (NBC 9.36 values shown)). |
| 16.1 m² (by the bag’s coverage) | Floor batts (R-13 to R-38)R-31, with supports | 17.8 m² of floor over the vented crawlspace, less 10% for the joists. effective RSI 4.67 (R-26.5) (Ontario’s SB-12 (NBC 9.36 values shown)). |
| 52.8 m² | Polyethylene sheeting (vapor retarder)6-mil, warm side, laps sealed | On the warm side of the outside walls and the top ceiling, laps sealed with acoustic sealant — the usual Canadian detail (NBC 9.25.4). Ask your building department if you use another vapour control. |
| 2 cans | Spray foam, gaps and cracks340 g cans | Air-sealing the plates, the rim, the window shims and the wire and pipe holes: about one can per 7.62 m of wall per story. |
| 2 cans | Fireblock sealant (fire-rated foam)340 g cans | Fire-rated foam at the top plates and floor penetrations. |
| 9 sheets | Drywall 13 mm13 mm, 4×12 sheets | (12.19 m of outside wall + 4.88 m along the house) × 2.44 m, − openings = 33.5 m² + 12% for cuts ÷ 4.5 m². |
| 5 sheets | Drywall 13 mm ceiling board (sag-resistant)13 mm ceiling board, 4×12 sheets | 17.8 m² + 12% ÷ 4.5 m². Sag-resistant board for framing 610 mm apart with insulation on top. |
| ≈589 screws (1.4 kg) | Drywall screws, coarse thread32 mm coarse thread | USG spacing: 4 per stud on walls (406 mm apart), 5 per joist or truss on ceilings (305 mm apart), + 10%. About 550 per kg. |
| 2 pails | All-purpose joint compound17 L pail (≈28 kg) | 20.9 L: about 1 L per 2.5 m² of board (USG), three coats. |
| 1 roll | Paper joint tape76.2 m roll | 62.32 m: about 1.2 m per m² of board (USG). |