Sign in Open StudSheet

StudSheet Sheets Flooring & tile · Sheet S-05

Carpet calculator

14′ × 12′ room: 19.4 sq yd of carpet, 19.6 sq yd of pad and 13 pieces of tack strip, with the seams laid out. Tack strip, pad, seams and stretching — the full stretch-in install.

Free, no account needed. Type your own sizes and every line is counted again.

Worked example · feet and inches (New Jersey) or metric (Ontario)

Sheet S-05 · Carpet a room

14′ × 12′ room

DIY OK
EDGE DETAILat every wall · 2× scale≤⅜″PLAN1 piece along the length14′12′12345678
Edge detail + layout
Carpet
19.4sq yd
Pad
19.6sq yd
Tack strip
134 ft pieces
Seams
0one piece

Tools you need

  • Knee kicker
  • Carpet knife
  • Utility knife + blades
  • Carpet wall trimmer
  • Stair tool (carpet tucker)
  • Framing hammer

18 tools on the Sheet, each marked own, buy or rent

What to buy 7 lines, each with its math
BuyItemHow we got this
19.4 sq yd (174 sq ft)Carpet12′ roll width, plain1 piece 12′ wide × 14′ 6″ (the room’s length + 3″ at each wall), run along the length because that gives the fewest seams (none) for the least carpet. 3% ends up as offcut. No seams. 12′ roll picked: least carpet (15′ roll: 1 piece, no seam, 20.9 sq yd).
19.6 sq yd (177 sq ft)Carpet pad (cushion)7/16″ 6-lb rebond168 sq ft room + 5%. Pad is trimmed to the inside edge of the tack strip.
13 stripsTack strip (“tackless strip”)4 ft pieces49′ of wall (doorways skipped) + 5% ÷ 4 ft per strip. Nail it ⅜″ or less from the wall, pins toward the wall.
1 boxStaples ½″½″, for your staplerA staple every 6″ along the pad edge and pad seams.
1 rollDuct tape (pad seams)rollTape the pad seams so they don’t shift.
1 stripCarpet-to-hard-floor transition36″One per doorway to a hard floor.
1 pack + 1 rollContractor bags + duct tapeheavy-dutyCut the old carpet into 3 ft strips, roll and tape. Check your town’s bulk pickup rules.
Flooring & tile · Sheet S-05 · 01What to buy (14′ × 12′ room)

What to buy (14′ × 12′ room)

Every line shows the quantity to buy and how StudSheet got it: the spacing, the waste and the package size, so you can check it before the supply house or the quote.

BuyMaterialHow StudSheet counts itWhat it is for
19.4 sq yd (174 sq ft)Carpet (12′ roll width, plain)1 piece 12′ wide × 14′ 6″ (the room’s length + 3″ at each wall), run along the length because that gives the fewest seams (none) for the least carpet. 3% ends up as offcut. No seams. 12′ roll picked: least carpet (15′ roll: 1 piece, no seam, 20.9 sq yd).Sold by the square yard or foot in 12 ft or 15 ft rolls.
19.6 sq yd (177 sq ft)Carpet pad (cushion) (7/16″ 6-lb rebond)168 sq ft room + 5%. Pad is trimmed to the inside edge of the tack strip.Goes under the carpet, inside the tack strip.
13 stripsTack strip (“tackless strip”) (4 ft pieces)49′ of wall (doorways skipped) + 5% ÷ 4 ft per strip. Nail it ⅜″ or less from the wall, pins toward the wall.The thin wood strip with angled pins that grips the carpet edge. Pins face the wall.
1 boxStaples ½″ (½″, for your stapler)A staple every 6″ along the pad edge and pad seams.For stapling carpet pad to wood.
1 rollDuct tape (pad seams) (roll)Tape the pad seams so they don’t shift.Joins pad pieces.
1 stripCarpet-to-hard-floor transition (36″)One per doorway to a hard floor.Metal or wood strip that finishes carpet at a doorway.
1 pack + 1 rollContractor bags + duct tape (heavy-duty)Cut the old carpet into 3 ft strips, roll and tape. Check your town’s bulk pickup rules.For rolling up and hauling the old carpet.

In Canada (4.27 m × 3.66 m room)

Set to Canada, the Sheet works the job out again for Ontario: metric sizes, bag sizes, the frost depth and the code notes. It doesn't just convert feet to meters. The first lines:

  • 16.2 m², Carpet: 1 piece 3.66 m wide × 4.42 m (the room’s length + 76 mm at each wall), run along the length because that gives the fewest seams (none) for the least carpet. 3% ends up as offcut. No seams. 3.66 m roll picked: least carpet (4.57 m roll: 1 piece, no seam, 17.5 m²).
  • 16.4 m², Carpet pad (cushion): 15.6 m² room + 5%. Pad is trimmed to the inside edge of the tack strip.
  • 13 strips, Tack strip (“tackless strip”): 14.94 m of wall (doorways skipped) + 5% ÷ 1.22 m per strip. Nail it 10 mm or less from the wall, pins toward the wall.
  • 1 box, Staples 13 mm: A staple every 152 mm along the pad edge and pad seams.
  • 1 roll, Duct tape (pad seams): Tape the pad seams so they don’t shift.
  • 1 strip, Carpet-to-hard-floor transition: One per doorway to a hard floor.
Flooring & tile · Sheet S-05 · 02The steps, in order

The steps, in order

  1. Pull the old carpet and pad; pull staples. Keep tack strip that’s solid with sharp pins.
  2. Screw down squeaky subfloor to the joists.
  3. Nail tack strip around the room: a gap from the wall of slightly less than the carpet’s thickness (max ⅜″), pins angled toward the wall. Skip doorways.
  4. Lay pad, staple it along the inside edge of the strip, and trim it flush — never over the strip. Tape the seams.
  5. Rough-cut carpet with 3″ extra at every wall.
  6. Position the carpet with the pile running the same way everywhere.
  7. Hook one corner with the knee kicker, then power-stretch toward the far walls.
  8. Trim with the wall trimmer, tuck into the gully with the stair tool. Install transitions; cut out vents.
Flooring & tile · Sheet S-05 · 03Tools (18)

Tools (18)

Must-have tools first, then the ones that help and the ones to rent for the day.

ToolNeedWhy
Knee kickerMust haveHooks the carpet on the strip along each wall
Carpet knifeMust haveHeavy knife for cutting carpet from the back.
Utility knife + bladesMust haveScores drywall and vinyl plank, trims pad. Swap blades often.
Carpet wall trimmerMust haveRides along the wall and trims carpet to the exact length for tucking.
Stair tool (carpet tucker)Must haveTucks the edge into the gully
Framing hammerMust haveNails tack strip
Aviation snipsMust haveCuts tack strip
Straightedge (6 ft)Must haveDead-straight edge for cutting sheets and checking floor flatness.
Chalk lineMust haveSnaps a long straight line on floors, subfloors and ceilings.
Tape measure (25 ft)Must haveThe red boxes every 16″ on the blade are stud spacing.
Knee padsMust haveFlooring and tile are all knees.
Work glovesMust haveTack strip pins bite
Safety glassesMust haveEvery cut, every nail, every time.
Hammer tacker (staple gun)Must haveStaples carpet pad to a wood subfloor.
Pry barMust havePulls baseboards, old tack strip and flooring.
Floor scraperMust haveRemoves old pad, staples and adhesive.
Power stretcherRentThe carpet standard (CRI 105) makes it mandatory
Shop vacGood to haveDrywall dust, grout, sawdust.
Flooring & tile · Sheet S-05 · 04Mistakes and how the math works

Mistakes and how the math works

Mistakes that cost a callback or a second trip

  • Pad over the tack strip: The pins can’t grab the carpet backing and the edge pulls loose. Trim pad to the strip’s inside edge.
  • Stretching with only a knee kicker: Ripples within months. The carpet install standard (CRI 105) makes a power stretcher mandatory.
  • Seams in the wrong place: Seams across a doorway or across the traffic path fray and show. Run them with traffic, and not across the light from the main window.

What the calculator assumes

  • Full-width pieces run in the direction with the fewest seams, then the least carpet; +3″ at each end for trimming.
  • No fill pieces (a pro may piece fills to save carpet; the pile direction must stay the same).
  • Tack strip in 4 ft pieces around the room, minus 36″ per doorway, +5%.
  • CRI 105 (the carpet installation standard): power stretcher mandatory; gully slightly less than the carpet thickness, max ⅜″; pad trimmed flush with the strip; seams parallel to traffic and not across natural light.
  • Plain carpet. Patterns need extra for matching.
Flooring & tile · Sheet S-05 · 05Code, permits and safety

Code, permits and safety

The Sheet sets its code notes for the job's state or province. These are New Jersey's and Ontario's; the code reference has more. Always confirm with your building department.

  • Get an install quote before renting tools: Stores often quote carpet installation. Compare it with renting a power stretcher and seaming iron.
  • 12′ roll: least carpet: The Sheet picked the roll width. 12′ roll: 1 piece, no seam, 19.4 sq yd. 15′ roll: 1 piece, no seam, 20.9 sq yd. Change it under “Carpet roll width”.
  • 3.66 m roll: least carpet: The Sheet picked the roll width. 3.66 m roll: 1 piece, no seam, 16.2 m². 4.57 m roll: 1 piece, no seam, 17.5 m². Change it under “Carpet roll width”.
Flooring & tile · Sheet S-05 · 06Questions

Questions

What materials do I need to carpet a room?

For the worked example, a 14′ × 12′ room, the Sheet counts 7 lines with waste included, starting with carpet (19.4 sq yd (174 sq ft)), carpet pad (cushion) (19.6 sq yd (177 sq ft)), tack strip (“tackless strip”) (13 strips), staples ½″ (1 box). Each line's math is in the table above. Put in your own sizes in the carpet a room calculator and every line is counted again.

How long does it take to carpet a room, and can I do it myself?

About 10 to 15 hours for the worked example, in 8 steps. StudSheet stamps it DIY OK: you can do this.

What tools do I need to carpet a room?

18 in all. The must-haves start with knee kicker, carpet knife, utility knife + blades, carpet wall trimmer, stair tool (carpet tucker), framing hammer. On the Sheet you mark each one as owned, to buy or to rent.

Flooring & tile · Sheet S-05 · 07Ask about it

Ask about it

Stuck while you carpet a room? Ask in the Carpet group of the StudSheet community with this Sheet attached. Homeowners who've done it and verified pros answer, and anyone can read it.

Flooring & tile · Sheet S-05 · 08More flooring & tile Sheets

More flooring & tile Sheets

  • Flooring for contractors: run this takeoff at your own prices, send the estimate, and get it signed and the deposit paid.
  • Install vinyl plank flooring (14′ × 12′ floor): Click-together LVP: boxes, trim, transitions and the gaps that matter.
  • Tile a floor (8′ × 5′ bathroom): Backer, thinset, tile and grout sized to your tile — bathroom, kitchen or entry, with the toilet reset when there is one.
  • Hardwood and laminate floors (14′ × 12′ floor): Install solid or engineered hardwood or laminate, or sand and refinish an old wood floor.
  • Tile a kitchen backsplash (12′ of backsplash, 18″ tall): Tile, adhesive, grout, edge trim and outlet extenders for the wall between the counter and the cabinets, counted from the run and height.
  • Tile a shower or tub surround (5′ tub surround, tiled to 7′): Backer board, waterproofing, tile, thinset and grout for a tub surround or a walk-in shower — every seam, corner and pipe sealed.
  • Carpet stairs (13 steps, 3′ wide): Carpet, pad and tack strip cut step by step — waterfall or wrapped (Hollywood) — with the pile running down the stairs and the landing included.
  • All 45 Sheets, across 16 trades.
  • Code reference: frost depths, guard heights, stairs, retaining walls.

Get the Sheet.

Open StudSheet
Coming soon on theApp StoreComing soon onGoogle Play