Sheet S-19 · Panel or service upgrade
100 A to 200 A service
- Service
- 200 Afrom 100 A · overhead
- Conductors
- 4/0 AWG Alor 2/0 AWG Cu
- Panel
- 40spaces · main lug
- Breakers
- 204 two-pole · 0 AFCI/GFCI
Tools you need
- Non-contact voltage tester
- Digital multimeter
- Lockout/tagout kit
- Insulating rubber gloves
- Insulated screwdrivers (1000 V)
- Torque screwdriver
19 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 20 ft — cut to length | SEU cable 4/0-4/0-4/0, aluminum | Service head to the meter base, 4/0 AWG aluminum (2/0 AWG copper) (NEC 310.12). 20 ft is a guess — measure on site. A mast replaces it where the drop needs height. |
| 1 head | SE cable weatherhead | Above the point where the service drop attaches, with drip loops. |
| 1 meter-main | Meter-main combination200 A | Meter socket and the 200 A service breaker in one enclosure — the outdoor emergency disconnect (NEC 230.85). From the utility’s approved list. |
| 20 ft — cut to length | SER cable 4/0-4/0-4/0-2/0, aluminum | Feeder, meter-main to the panel (4-wire SER): 10 ft + 6 ft for the ends + 10%. 4/0 AWG aluminum, or 2/0 AWG copper (NEC 310.12). |
| 4 connectors | SE cable connectors | One at each end of every SE cable run. |
| 14 straps | SE cable straps | Outside within 12″ of the head and each enclosure and every 30″ (NEC 230.51); inside every 4½ ft. |
| 1 panel | Main lug panel (load center)200 A, 40 spaces | 40 spaces wanted → a 40-space panel — the moved circuits take 24. Main lug: the breaker ahead of it (the meter-main) protects it. |
| 16 breakers | Breaker, single-pole15 or 20 A | One per moved 120 V circuit, matched to its wire (14 AWG → 15 A, 12 AWG → 20 A), listed for the new panel. |
| 4 breakers | Breaker, 2-poleto match each circuit | One per moved 240 V circuit (range, dryer, water heater, AC…), matched to its wire. |
| 1 surge protector | Whole-home surge protector (Type 1 or 2) | Required with the new service equipment (NEC 230.67). |
| 25 ft | Bare copper wire 6 AWG | to the rods: 15 ft + 6 ft between them + slack. Lengths are a guess — measure on site. |
| 20 ft | Bare copper wire 4 AWG | to the water pipe: 15 ft + a jumper around the water meter. Lengths are a guess — measure on site. |
| 2 rods | Ground rod, copper-bonded5/8″ × 8 ft | Two rods at least 6 ft apart; one alone must test at 25 ohms or less (NEC 250.53(A)). |
| 2 clamps | Ground rod clamp | One per rod, listed for direct burial. |
| 2 clamps | Water pipe ground clamp | The grounding conductor near where the pipe enters (within 5 ft, NEC 250.68(C)), and the jumper around the water meter. |
| 1 termination | Intersystem bonding termination | Cable TV, phone and satellite bonds land here (NEC 250.94). |
| 1 tube | Antioxidant compound | Aluminum service and feeder conductors at the lugs, where the lug maker calls for it. |
| 1 pack | Duct seal | Seal the service entrance and the conduit entries. |
| 1 kit | Panel labels | Circuit directory (NEC 408.4) and the emergency disconnect marking (230.85(E)). |
Sheet S-19 · Panel or service upgrade
100 A to 200 A service
- Service
- 200 Afrom 100 A · overhead
- Conductors
- 4/0 AWG Alor 2/0 AWG Cu
- Panel
- 40spaces · main lug
- Breakers
- 204 two-pole · 0 AFCI/GFCI
Tools you need
- Non-contact voltage tester
- Digital multimeter
- Lockout/tagout kit
- Insulating rubber gloves
- Insulated screwdrivers (1000 V)
- Torque screwdriver
19 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 6.10 m — cut to length | SEU cable 4/0-4/0-4/0, aluminum | Service head to the meter base, 4/0 AWG aluminum (2/0 AWG copper). 6.10 m is a guess — measure on site. A mast replaces it where the drop needs height. |
| 1 head | SE cable weatherhead | Above the point where the service drop attaches, with drip loops. |
| 1 meter-main | Meter-main combination200 A | Meter socket and the 200 A service breaker in one enclosure. From the utility’s approved list. |
| 6.10 m — cut to length | SER cable 4/0-4/0-4/0-2/0, aluminum | Feeder, meter-main to the panel (4-wire SER): 3.05 m + 1.83 m for the ends + 10%. 4/0 AWG aluminum, or 2/0 AWG copper. |
| 4 connectors | SE cable connectors | One at each end of every SE cable run. |
| 14 straps | SE cable straps | Outside every 750 mm and within 300 mm of the head and each enclosure; inside every 1.5 m. |
| 1 panel | Main lug panel (load center)200 A, 40 spaces | 40 spaces wanted → a 40-space panel — the moved circuits take 24. Main lug: the breaker ahead of it (the meter-main) protects it. |
| 16 breakers | Breaker, single-pole15 or 20 A | One per moved 120 V circuit, matched to its wire (14 AWG → 15 A, 12 AWG → 20 A), listed for the new panel. |
| 4 breakers | Breaker, 2-poleto match each circuit | One per moved 240 V circuit (range, dryer, water heater, AC…), matched to its wire. |
| 15.24 m | Bare copper wire 6 AWG | to the rods: 4.57 m + 3.0 m between them + slack; to the water pipe: 4.57 m + a jumper around the water meter. Lengths are a guess — measure on site. |
| 2 rods | Ground rod, copper-bonded3 m × 15.8 mm | Two rods, 3.0 m apart, driven full length. |
| 2 clamps | Ground rod clamp | One per rod, listed for direct burial. |
| 2 clamps | Water pipe ground clamp | The grounding conductor near where the pipe enters, and the jumper around the water meter. |
| 1 tube | Antioxidant compound | Aluminum service and feeder conductors at the lugs, where the lug maker calls for it. |
| 1 pack | Duct seal | Seal the service entrance and the conduit entries. |
| 1 kit | Panel labels | Circuit directory. |