Sign in Open StudSheet

StudSheet Sheets Carpentry & framing · Sheet S-36

Stair stringer calculator

Inside stairs, 8′ 9″ rise: 14 risers of 7-1/2″, 13 treads, 4 stringers (2×12 × 16′) and 11′ 4-1/2″ of floor space. Stringers, treads, risers, skirt boards and a handrail for a straight run or one with a landing — laid out to the code’s rise, run and headroom.

Free, no account needed. Type your own sizes and every line is counted again.

Worked example · feet and inches (New Jersey) or metric (Ontario)

Sheet S-36 · Build interior or basement stairs

Inside stairs, 8′ 9″ rise

PRO STEP
SIDE VIEWstringer, treads and risersopening 11′rise 8′ 9″run 11′ 4-1/2″7-1/2″10-1/2″1234
Side view
Steps
1314 risers of 7-1/2″
Stringers
42×12 × 16′
Run
11′ 4-1/2″floor space
Headroom
OKopening ≥ 10′ 8-3/4″

Tools you need

  • Framing square
  • Stair gauges
  • Circular saw
  • Handsaw
  • Miter saw
  • Tape measure (25 ft)

24 tools on the Sheet, each marked own, buy or rent

What to buy 16 lines, each with its math
BuyItemHow we got this
4 boards2×12 framing lumber2×12 × 16′4 stringers at 11-1/2″ on center across 36″ (at most 12″ under ¾″ plywood; at least 3). Each is 14′ 4-1/4″ along the slope + 12″ for the end cuts.
1 boardPressure-treated 2×4treated 2×4 × 8′Across the stringer feet, screwed into the slab: treated, because it sits on concrete.
4 connectorsAdjustable stair-stringer connectorgalvanized, adjustableOne per stringer where it hangs from the header.
1 boxConnector fastenersas the connector maker specifiesStructural screws or nails listed on the connector’s label — not drywall or deck screws.
1 small boxConcrete screws 3¼″3 through the kicker into the slab.
1 box3″ framing screwsThe wall-side stringers screwed into every stud they cross, 3 at each.
3 sheetsPlywood ¾″, 4×8¾″ 4×8 sheets13 treads 11-1/2″ deep (the 10-1/2″ run + 1″ of nosing) + 1 spare and 14 risers 7-1/2″ tall, ripped from 4×8 sheets: 2 pieces 36″ long from each 8′ strip.
4 tubesConstruction adhesive10 oz tubesA bead on every stringer under each tread and behind each riser: about a tube per 4 treads. Glue is what keeps stairs from squeaking.
≈216 screws (3 boxes of 100)3″ framing screws2½″ construction screws2 per stringer through every tread and riser.
1 boxFinish nails (15 or 16-ga)15-gauge, 2″Skirt boards and the odd trim piece.
1 boardPrimed skirt board, 1×121×12 primed × 16′One along each wall: the slope + 12″ for the level ends.
2 newelsBox newel postbox newelTop and bottom of each open side, bolted into the stringer and the floor framing.
2 kitsNewel mounting kitlag or bolt kitOne per newel: a lag or bolt kit that ties it into the framing so it can’t wobble.
26 balustersWood balusters (1¼″ square or turned)36″ and 41″, square top2 per tread × 13 treads: 10-1/2″ treads leave gaps under 4⅜″. A short and a long one on each tread.
1 lengthHandrail, graspable profilegraspable profile × 16′On top of the balusters between the newels, 36″ above the nosings: graspable, so it’s the handrail too.
1 quartTrim & door paintsatin or semi-gloss enamel14 sq ft of skirt boards × 2 coats at 350 sq ft/gal = 0.08 gal.
Carpentry & framing · Sheet S-36 · 01What to buy (Inside stairs, 8′ 9″ rise)

What to buy (Inside stairs, 8′ 9″ rise)

Every line shows the quantity to buy and how StudSheet got it: the spacing, the waste and the package size, so you can check it before the supply house or the quote.

BuyMaterialHow StudSheet counts itWhat it is for
4 boards2×12 framing lumber (2×12 × 16′)4 stringers at 11-1/2″ on center across 36″ (at most 12″ under ¾″ plywood; at least 3). Each is 14′ 4-1/4″ along the slope + 12″ for the end cuts.Actually 1½″ × 11¼″. Joists, rafters, rims and ledgers.
1 boardPressure-treated 2×4 (treated 2×4 × 8′)Across the stringer feet, screwed into the slab: treated, because it sits on concrete.Treated against rot — for wood touching concrete or outdoors.
4 connectorsAdjustable stair-stringer connector (galvanized, adjustable)One per stringer where it hangs from the header.Galvanized bracket that ties each stringer to the deck rim.
1 boxConnector fasteners (as the connector maker specifies)Structural screws or nails listed on the connector’s label — not drywall or deck screws.Use exactly what the connector maker specifies.
1 small boxConcrete screws 3¼″3 through the kicker into the slab.Anchor the bottom kicker board to the pad.
1 box3″ framing screwsThe wall-side stringers screwed into every stud they cross, 3 at each.Construction screws for framing by hand. (16d nails if you use a nailer.)
3 sheetsPlywood ¾″, 4×8 (¾″ 4×8 sheets)13 treads 11-1/2″ deep (the 10-1/2″ run + 1″ of nosing) + 1 spare and 14 risers 7-1/2″ tall, ripped from 4×8 sheets: 2 pieces 36″ long from each 8′ strip.Ripped into treads and risers for stairs that get carpet (glued and screwed to every stringer so they don’t squeak), or cut into the side forms for concrete steps.
4 tubesConstruction adhesive (10 oz tubes)A bead on every stringer under each tread and behind each riser: about a tube per 4 treads. Glue is what keeps stairs from squeaking.Glue bead under plates; stops squeaks and creep.
≈216 screws (3 boxes of 100)3″ framing screws (2½″ construction screws)2 per stringer through every tread and riser.Construction screws for framing by hand. (16d nails if you use a nailer.)
1 boxFinish nails (15 or 16-ga) (15-gauge, 2″)Skirt boards and the odd trim piece.Face-nail the first and last rows where the flooring nailer can’t reach. Pre-drill hardwood.
1 boardPrimed skirt board, 1×12 (1×12 primed × 16′)One along each wall: the slope + 12″ for the level ends.The finished board along the wall above the treads, cut to the stair’s slope: treads, risers and carpet butt into it.
2 newelsBox newel post (box newel)Top and bottom of each open side, bolted into the stringer and the floor framing.The heavy post at the ends and turns of an inside railing, fastened into the floor framing or the stringer.
2 kitsNewel mounting kit (lag or bolt kit)One per newel: a lag or bolt kit that ties it into the framing so it can’t wobble.A bolt or lag kit that ties the newel into the framing so it can’t wobble.
26 balustersWood balusters (1¼″ square or turned) (36″ and 41″, square top)2 per tread × 13 treads: 10-1/2″ treads leave gaps under 4⅜″. A short and a long one on each tread.Inside balusters, set into the treads or a shoe rail and up into the handrail.
1 lengthHandrail, graspable profile (graspable profile × 16′)On top of the balusters between the newels, 36″ above the nosings: graspable, so it’s the handrail too.The inside rail on top of the balusters. Its profile is graspable, so on stairs it is the handrail as well as the top of the guard.
1 quartTrim & door paint (satin or semi-gloss enamel)14 sq ft of skirt boards × 2 coats at 350 sq ft/gal = 0.08 gal.Semi-gloss — wipeable.

In Canada (Inside stairs, 2.67 m rise)

Set to Canada, the Sheet works the job out again for Ontario: metric sizes, bag sizes, the frost depth and the code notes. It doesn't just convert feet to meters. The first lines:

  • 4 boards, 2×12 framing lumber: 4 stringers at 292 mm on center across 914 mm (at most 305 mm under 19 mm plywood; at least 3). Each is 4.37 m along the slope + 305 mm for the end cuts.
  • 1 board, Pressure-treated 2×4: Across the stringer feet, screwed into the slab: treated, because it sits on concrete.
  • 4 connectors, Adjustable stair-stringer connector: One per stringer where it hangs from the header.
  • 1 box, Connector fasteners: Structural screws or nails listed on the connector’s label — not drywall or deck screws.
  • 1 small box, Concrete screws 83 mm: 3 through the kicker into the slab.
  • 1 box, 76 mm framing screws: The wall-side stringers screwed into every stud they cross, 3 at each.
Carpentry & framing · Sheet S-36 · 02The steps, in order

The steps, in order

  1. Measure the total rise where the stairs go, finished floor to finished floor (add the flooring thickness top and bottom if it isn’t down yet).
  2. Check the opening: at least 10′ 8-3/4″ long from the header back, so the nosing line stays 6′ 8″ below its edge all the way up.
  3. Lay out the first stringer: stair gauges on the framing square at 7-1/2″ rise and 10-1/2″ run, 13 notches; then drop the bottom by the tread thickness (3/4″) so the first step matches.
  4. Cut the notches, stopping at the lines; finish each corner with a handsaw. Test-fit, then trace the other stringers and cut the skirt boards to match.
  5. Hang the stringers from the header with connectors, 11-1/2″ on center; screw the wall-side ones into the studs; kick the bottom with a treated 2×4 screwed into the slab.
  6. Risers then treads: glue and screw each one, the riser first (squeak-free); keep every riser within ⅜″ of the next.
  7. Handrail: 34–38″ above the nosings, returned to the wall at both ends, brackets into studs about every 4 ft.
  8. Guards on the open side: newels at the top and bottom bolted into the framing, 2 balusters per tread, the handrail on top at 36″ above the nosings.
  9. Paint the skirt boards: two coats of enamel over the primer.
  10. Ready for carpet: sink every screw head, fill gaps over ⅛″, and sweep (the Carpet stairs Sheet counts the carpet).
Carpentry & framing · Sheet S-36 · 03Tools (24)

Tools (24)

Must-have tools first, then the ones that help and the ones to rent for the day.

ToolNeedWhy
Framing squareMust haveLays out every notch
Stair gaugesMust haveClamp on the square so every notch is identical
Circular sawMust haveCuts the notches and rips the treads
HandsawMust haveFinishes the notch corners: don’t over-cut with the circular saw
Miter sawMust haveTreads, risers and skirt boards cut square and clean
JigsawGood to haveSkirt-board notches and odd cuts
Tape measure (25 ft)Must haveThe red boxes every 16″ on the blade are stud spacing.
Carpenter's pencilMust haveFlat, doesn't roll away, marks rough lumber.
4-ft levelMust haveEvery tread level both ways
6-ft levelMust haveChecks the stringers in line and the skirt boards straight
Chalk lineGood to haveSnaps the stringer line on the wall
Clamps (2)Must haveHold stringers together to mark matching copies.
SawhorsesMust haveCutting support.
Cordless drill/driverMust haveDrills holes, drives screws, mixes small batches.
Impact driverMust haveDrives the stringer and tread screws
Caulk gunMust haveConstruction adhesive under every tread
Stud finderMust haveFinds the studs for the stringers and the handrail brackets
Finish nailer (15/16-ga)Good to haveSkirts and risers, fast and with small holes
Hammer drill + masonry bitRentDrills the slab for the kicker’s concrete screws
Safety glassesMust haveEvery cut, every nail, every time.
Hearing protectionMust haveSaws and nailers are loud enough to damage hearing.
N95 dust masksMust haveSawdust, and sanding the finish between coats
Work glovesMust haveTack strip, block and lumber shred hands.
Step ladder (6 ft)Must haveFor the header and the top of the handrail
Carpentry & framing · Sheet S-36 · 04Mistakes and how the math works

Mistakes and how the math works

Mistakes that cost a callback or a second trip

  • Measuring the rise before the finish floors: New flooring at the top or bottom makes the first or last step taller or shorter than the rest — measure finished floor to finished floor.
  • Forgetting to drop the stringer: The bottom step ends up 3/4″ taller than the rest. Inspectors fail more than ⅜″ between steps, and people trip on it.
  • Headroom checked only at the top step: The tightest spot is under the opening’s edge: measure 6′ 8″ straight up from the nosing line there.
  • Nails only: Treads and risers glued and screwed don’t squeak; nailed ones do within a year.
  • A handrail that just stops: Return each end to the wall or a newel so a sleeve or a bag strap can’t catch on it.

What the calculator assumes

  • IRC 2021 R311.7 / 2024 R318.7: risers ≤ 7¾″, treads ≥ 10″ (nosing ¾–1¼″ when the tread is under 11″), ⅜″ max variation, width ≥ 36″, headroom 6′ 8″ along the nosing line, at most 12′ 7″ (151″) per flight, handrail 34–38″ at 4+ risers; guards over a 30″ drop (R312; R321 in the 2024 IRC).
  • Layout: 14 risers of 7-1/2″ (from 7-1/2″ preferred) and 13 treads of 10-1/2″ run + 1″ of nosing; the upper floor is the top step. 2R + T = 25.5″ (24–25″ is comfortable).
  • Stringers: 2×12, cut, at most 12″ apart under ¾″ plywood treads (typical), at least 3, hung from the header with connectors; at least 3½″ of wood left below the notches.
  • Headroom: 6′ 8″ measured straight up from the line along the nosings to the underside of the floor above (the floor 11-1/4″ thick at the opening), so the opening runs back from the header at least 10′ 8-3/4″.
  • Pull-down attic ladders aren’t counted here; a fixed stair to an attic needs a full-size opening, which is structural work.
Carpentry & framing · Sheet S-36 · 05Code, permits and safety

Code, permits and safety

The Sheet sets its code notes for the job's state or province. These are New Jersey's and Ontario's; the code reference has more. Always confirm with your building department.

  • A guard on the open side: The open side is more than 30″ above the floor, so it needs a guard at least 34″ tall (measured from the nosings) with openings under 4⅜″ (IRC R312.1; R321.1 in the 2024 IRC): 2 balusters per tread, a newel at the top and the bottom bolted into the framing, and the handrail on top. Solid newels are the hard part; the Railings Sheet lays out other styles.
  • A handrail is required: Stairs with 4 or more risers need a graspable handrail 34–38″ above the nosings on at least one side (IRC R311.7.8; R320 in the 2024 IRC). It runs the whole flight, ends returned to the wall or a newel, 1½″ from the wall.
  • Permit likely needed: A new or replaced stair is structural work: New Jersey towns usually want a construction permit, with a framing inspection. Ask your town’s construction office.
Carpentry & framing · Sheet S-36 · 06Questions

Questions

What materials do I need to build basement or interior stairs?

For the worked example, a inside stairs, 8′ 9″ rise, the Sheet counts 16 lines with waste included, starting with 2×12 framing lumber (4 boards), pressure-treated 2×4 (1 board), adjustable stair-stringer connector (4 connectors), connector fasteners (1 box). Each line's math is in the table above. Put in your own sizes in the inside stairs calculator and every line is counted again.

How long does it take to build basement or interior stairs, and can I do it myself?

About 18 to 28 hours for the worked example, in 10 steps. StudSheet stamps it PRO STEP: dIY with a pro for one step.

What tools do I need to build basement or interior stairs?

24 in all. The must-haves start with framing square, stair gauges, circular saw, handsaw, miter saw, tape measure (25 ft). On the Sheet you mark each one as owned, to buy or to rent.

Carpentry & framing · Sheet S-36 · 07Ask about it

Ask about it

Stuck while you build basement or interior stairs? Ask in the Interior and basement stairs group of the StudSheet community with this Sheet attached. Homeowners who've done it and verified pros answer, and anyone can read it.

Carpentry & framing · Sheet S-36 · 08More carpentry & framing Sheets

More carpentry & framing Sheets

  • Carpentry and framing for contractors: run this takeoff at your own prices, send the estimate, and get it signed and the deposit paid.
  • Build an interior wall (12′ wall, 8′ tall, 1 door): Frame a non-load-bearing partition, hang drywall, tape and mud.
  • Install baseboard and trim (14′ × 12′ room): Baseboard, shoe, door casing and crown for a room: lengths that fit your walls, coped and mitered corners, nails, caulk and paint.
  • Closet shelving (6′ reach-in closet): Wire or wood shelves for a reach-in or walk-in closet: shelf lengths that fit, rods, brackets on studs, and the anchors for the rest.
  • Build a storage shed (8′ × 10′ shed): A stick-built gable or lean-to shed: foundation, floor, wall framing, rafters, sheathing, siding, roofing, doors — every board counted, with the permit size limits where you live.
  • Build a media wall (12′ media wall, 65-inch TV, 6 niches): A framed false wall for the TV: studs, drywall, niches, a recessed TV panel and LED strips, with the steps and a front elevation.
  • All 45 Sheets, across 16 trades.
  • Code reference: frost depths, guard heights, stairs, retaining walls.

Get the Sheet.

Open StudSheet
Coming soon on theApp StoreComing soon onGoogle Play