Sign in Open StudSheet

StudSheet Sheets Carpentry & framing · Sheet S-26

Closet shelving calculator

6′ reach-in closet: 6 ft of shelf (1 run, 12″ deep), 6 ft of rod and 10 supports, on studs where they fall. Wire or wood shelves for a reach-in or walk-in closet: shelf lengths that fit, rods, brackets on studs, and the anchors for the rest.

Free, no account needed. Type your own sizes and every line is counted again.

Worked example · feet and inches (New Jersey) or metric (Ontario)

Sheet S-26 · Closet shelving

6′ reach-in closet

DIY OK
BACK WALLwire shelves on clips, 12″ deep6′84″123
Shelves on the back wall
Shelves
6 ft1 run, 12″ deep
Rods
6 ftin the shelf-and-rod
Supports
10clips + braces
Walls
1reach-in

Tools you need

  • Stud finder
  • 4-ft level
  • Tape measure (25 ft)
  • Carpenter's pencil
  • Cordless drill/driver
  • Screwdriver set

10 tools on the Sheet, each marked own, buy or rent

What to buy 6 lines, each with its math
BuyItemHow we got this
1 pieceWire shelf-and-rod12″ deep × 6′1 run = 6 ft, the hanging rod built into the front edge: cut from the cheapest mix of 4, 6, 8 and 12 ft lengths. A hacksaw or bolt cutter cuts them.
2 packsWire shelf wall clips, 6-packA clip every 12″ along the back of each shelf, both ends included: 7 clips.
1 pairWire shelf end brackets, pairA pair for each shelf piece, where it meets a wall or another shelf.
3 bracesWire shelf support bracefor 12″ deep shelvesUnder the front edge about every 42″ (never more than 4 ft apart), one near each end: 3 for 6 ft of shelf.
1 box3″ framing screws2½″ screwsAbout 8 screws into the studs (clips and braces that land on a stud; most kits include short screws).
1 packToggle bolts ¼″ × 3″, 10-pack2 points between studs get a toggle bolt, not a plastic anchor: they hold the load, the clothes and anyone who leans on it.
Carpentry & framing · Sheet S-26 · 01What to buy (6′ reach-in closet)

What to buy (6′ reach-in closet)

Every line shows the quantity to buy and how StudSheet got it: the spacing, the waste and the package size, so you can check it before the supply house or the quote.

BuyMaterialHow StudSheet counts itWhat it is for
1 pieceWire shelf-and-rod (12″ deep × 6′)1 run = 6 ft, the hanging rod built into the front edge: cut from the cheapest mix of 4, 6, 8 and 12 ft lengths. A hacksaw or bolt cutter cuts them.Wire shelf with a hanging rod built into its front edge: hangers slide along under it.
2 packsWire shelf wall clips, 6-packA clip every 12″ along the back of each shelf, both ends included: 7 clips.Clips that hold the back wire of the shelf to the wall, one every foot or so.
1 pairWire shelf end brackets, pairA pair for each shelf piece, where it meets a wall or another shelf.Wall brackets that hold the ends of a wire shelf where it meets a side wall.
3 bracesWire shelf support brace (for 12″ deep shelves)Under the front edge about every 42″ (never more than 4 ft apart), one near each end: 3 for 6 ft of shelf.The diagonal brace under the front edge of a wire shelf, every 3–4 ft along it.
1 box3″ framing screws (2½″ screws)About 8 screws into the studs (clips and braces that land on a stud; most kits include short screws).Construction screws for framing by hand. (16d nails if you use a nailer.)
1 packToggle bolts ¼″ × 3″, 10-pack2 points between studs get a toggle bolt, not a plastic anchor: they hold the load, the clothes and anyone who leans on it.Spring-wing toggles that open behind drywall or plaster where there’s no stud. Far stronger than plastic anchors.

In Canada (1.83 m reach-in closet)

Set to Canada, the Sheet works the job out again for Ontario: metric sizes, bag sizes, the frost depth and the code notes. It doesn't just convert feet to meters. The first lines:

  • 1 piece, Wire shelf-and-rod: 1 run = 1.83 m, the hanging rod built into the front edge: cut from the cheapest mix of 4, 6, 8 and 3.66 m lengths. A hacksaw or bolt cutter cuts them.
  • 2 packs, Wire shelf wall clips, 6-pack: A clip every 305 mm along the back of each shelf, both ends included: 7 clips.
  • 1 pair, Wire shelf end brackets, pair: A pair for each shelf piece, where it meets a wall or another shelf.
  • 3 braces, Wire shelf support brace: Under the front edge about every 1.07 m (never more than 1.22 m apart), one near each end: 3 for 1.83 m of shelf.
  • 1 box, 76 mm framing screws: About 8 screws into the studs (clips and braces that land on a stud; most kits include short screws).
  • 1 pack, Toggle bolts 6 × 76 mm, 10-pack: 2 points between studs get a toggle bolt, not a plastic anchor: they hold the load, the clothes and anyone who leans on it.
Carpentry & framing · Sheet S-26 · 02The steps, in order

The steps, in order

  1. Empty the closet, fill old anchor holes (the Patch Sheet), and paint now if you will.
  2. Mark the shelf line: 84″ up for the top shelf, with the rod about 2″ under it. Draw a level line all around.
  3. Find and mark every stud on the lines (16″ apart).
  4. Back clips: a clip every 12″ on the line, screwed into studs where they land and with toggles between.
  5. Cut the shelves to length.
  6. Snap the shelves into the clips, add the end brackets and a support brace about every 42″ under the front edge.
  7. Rods: the shelf-and-rod pieces carry the hangers along their front edge; check each brace is tight under it.
Carpentry & framing · Sheet S-26 · 03Tools (10)

Tools (10)

Must-have tools first, then the ones that help and the ones to rent for the day.

ToolNeedWhy
Stud finderMust haveMark every stud on the shelf line
4-ft levelMust haveA level line all around the closet
Cross-line laser levelGood to haveOne line around all the walls at once
Tape measure (25 ft)Must haveThe red boxes every 16″ on the blade are stud spacing.
Carpenter's pencilMust haveFlat, doesn't roll away, marks rough lumber.
Cordless drill/driverMust havePilot holes and screws for the clips and braces
Screwdriver setMust haveOutlet covers, hardware, toilet bolts.
HacksawMust haveCut wire shelves to length (a bolt cutter is faster)
Step ladder (6 ft)Must haveThe top shelf is at 7 ft
Safety glassesMust haveDrilling overhead and cutting wire
Carpentry & framing · Sheet S-26 · 04Mistakes and how the math works

Mistakes and how the math works

Mistakes that cost a callback or a second trip

  • Plastic anchors for loaded shelves: Expansion anchors in drywall pull out under clothes and boxes. Studs, or toggle bolts between them.
  • Braces too far apart: Wire shelves sag and pull out of the clips. A brace at least every 4 ft, and near each end.
  • Forgetting the corner overlap: In a walk-in, the side shelves are shorter by the back shelf’s depth; cut them full length and they won’t fit.
  • A rod you can’t reach: A top shelf at 84″ puts the rod at about 82″: easy for most adults. Go lower for kids, double hang for shirts.

What the calculator assumes

  • Shelf heights (typical): top shelf 84″, double-hang lower shelf 42″, extra shelves 12″ apart; pantry shelves from 18″ up, at most 16″ apart.
  • Wire hardware (typical): a back clip every 12″, a brace about every 42″ and near each end, end brackets for each piece. Wood: cleats screwed into every stud; a bracket at least every 48″ under long shelves and rods.
  • Shelves and rods cut from the cheapest mix of the lengths stores sell (wire 4, 6, 8 and 12 ft; boards 8 ft; rods 4, 6 and 8 ft), at typical prices.
  • In a walk-in, the side shelves are the side wall’s length less the back shelf’s depth.
Carpentry & framing · Sheet S-26 · 05Code, permits and safety

Code, permits and safety

The Sheet sets its code notes for the job's state or province. These are New Jersey's and Ontario's; the code reference has more. Always confirm with your building department.

  • Studs first, toggles between: Clips, brackets and cleats go into studs wherever they can; between studs, toggle bolts. Plastic expansion anchors pull out under a loaded shelf.
Carpentry & framing · Sheet S-26 · 06Questions

Questions

What materials do I need to install closet shelving?

For the worked example, a 6′ reach-in closet, the Sheet counts 6 lines with waste included, starting with wire shelf-and-rod (1 piece), wire shelf wall clips, 6-pack (2 packs), wire shelf end brackets, pair (1 pair), wire shelf support brace (3 braces). Each line's math is in the table above. Put in your own sizes in the closet shelves calculator and every line is counted again.

How long does it take to install closet shelving, and can I do it myself?

About 1 to 2 hours for the worked example, in 7 steps. StudSheet stamps it DIY OK: you can do this.

What tools do I need to install closet shelving?

10 in all. The must-haves start with stud finder, 4-ft level, tape measure (25 ft), carpenter's pencil, cordless drill/driver, screwdriver set. On the Sheet you mark each one as owned, to buy or to rent.

Carpentry & framing · Sheet S-26 · 07Ask about it

Ask about it

Stuck while you install closet shelving? Ask in the Closets and shelving group of the StudSheet community with this Sheet attached. Homeowners who've done it and verified pros answer, and anyone can read it.

Carpentry & framing · Sheet S-26 · 08More carpentry & framing Sheets

More carpentry & framing Sheets

  • Carpentry and framing for contractors: run this takeoff at your own prices, send the estimate, and get it signed and the deposit paid.
  • Build an interior wall (12′ wall, 8′ tall, 1 door): Frame a non-load-bearing partition, hang drywall, tape and mud.
  • Install baseboard and trim (14′ × 12′ room): Baseboard, shoe, door casing and crown for a room: lengths that fit your walls, coped and mitered corners, nails, caulk and paint.
  • Build interior or basement stairs (Inside stairs, 8′ 9″ rise): Stringers, treads, risers, skirt boards and a handrail for a straight run or one with a landing — laid out to the code’s rise, run and headroom.
  • Build a storage shed (8′ × 10′ shed): A stick-built gable or lean-to shed: foundation, floor, wall framing, rafters, sheathing, siding, roofing, doors — every board counted, with the permit size limits where you live.
  • Build a media wall (12′ media wall, 65-inch TV, 6 niches): A framed false wall for the TV: studs, drywall, niches, a recessed TV panel and LED strips, with the steps and a front elevation.
  • All 45 Sheets, across 16 trades.
  • Code reference: frost depths, guard heights, stairs, retaining walls.

Get the Sheet.

Open StudSheet
Coming soon on theApp StoreComing soon onGoogle Play