Gutter calculator

84′ of gutter, 4 downspouts: 34 hangers every 32″, 4 downspouts (2×3, 2 × 10′ each) sized for 1503 sq ft of roof, and the corners, caps and outlets. Gutter size, downspouts sized to the roof they drain, hangers, corners, end caps, outlets, elbows and extensions — sectional for DIY or seamless by the foot.

Free, no account needed. Type your own sizes and every line is counted again.

Worked example · feet and inches (New Jersey) or metric (Ontario)

Sheet S-44 · Gutters and downspouts

84′ of gutter, 4 downspouts

DIY OK
ROOF PLANgable roof · gutters on the eaves · dots are downspouts42′32′DOWNSPOUToutlet to extension10 ft1234
Roof plan + downspout
Gutter
84ft · 5″ K-style aluminum
Downspouts
42×3, 2 × 10′ each
Hangers
34every 32″
Roof drained
1503sq ft

Tools you need

  • Chalk line
  • 4-ft level
  • Tape measure (25 ft)
  • Cordless drill/driver
  • Aviation snips
  • Hacksaw

17 tools on the Sheet, each marked own, buy or rent

What to buy 12 lines, each with its math
BuyItemHow we got this
4 lengthsAluminum K-style gutter, 5″5″ K-style × 16′2 runs of 42 ft of eaves (84 ft) in 16 ft and 10 ft lengths with the least left over, + 1 spare (one per 4 joints) for mistakes.
3 lengthsAluminum K-style gutter, 5″5″ K-style × 10′The rest of the runs, in 10 ft lengths, + 1 spare.
4 connectorsGutter connectors (slip joints)to matchOne at each joint between lengths, sealed from the inside.
34 hangersHidden gutter hangers with screwshidden, with screwsEvery 32″ (UIUC: no more than 32″ for aluminum) along 84 ft, + one at each run’s end; screwed into the rafter tails.
4 capsGutter end capsleft and rightTwo per run, crimped on and sealed.
4 outletsGutter drop outletsfor 2×3 downspoutsOne per downspout.
8 lengthsAluminum downspout 2×3, 10 ft2×3 × 10′4 downspouts × 2: eaves about 10 ft up + about 2 ft for the jog out to the wall.
12 elbowsDownspout elbows2×3, A and BTwo at the top to jog the pipe in to the wall, one at the bottom: 3 per downspout.
16 strapsDownspout strapsto matchTwo per 10 ft length, about every 6–8 ft.
4 extensionsDownspout extensionsflexible or a splash blockOne per downspout, carrying the water 4–6 ft from the foundation.
2 tubesGutter sealant, 10 oz tube10 oz tubesAbout a tube per 6 joints, caps, outlets and corners (12 here), run from the inside.
1 boxSheet-metal screws#8 × ½″ zip screws, box of 100Outlets, connectors, elbows and straps; pop rivets work too.
Roofing & siding · Sheet S-44 · 01What to buy (84′ of gutter, 4 downspouts)

What to buy (84′ of gutter, 4 downspouts)

Every line shows the quantity to buy and how StudSheet got it: the spacing, the waste and the package size, so you can check it before the supply house or the quote.

BuyMaterialHow StudSheet counts itWhat it is for
4 lengthsAluminum K-style gutter, 5″ (5″ K-style × 16′)2 runs of 42 ft of eaves (84 ft) in 16 ft and 10 ft lengths with the least left over, + 1 spare (one per 4 joints) for mistakes.Sectional aluminum gutter sold in 10 ft and 16 ft lengths; joined, capped and sealed on the ground.
3 lengthsAluminum K-style gutter, 5″ (5″ K-style × 10′)The rest of the runs, in 10 ft lengths, + 1 spare.Sectional aluminum gutter sold in 10 ft and 16 ft lengths; joined, capped and sealed on the ground.
4 connectorsGutter connectors (slip joints) (to match)One at each joint between lengths, sealed from the inside.Join two lengths; sealed from the inside.
34 hangersHidden gutter hangers with screws (hidden, with screws)Every 32″ (UIUC: no more than 32″ for aluminum) along 84 ft, + one at each run’s end; screwed into the rafter tails.Clip inside the gutter and screw through the fascia into the rafter tails.
4 capsGutter end caps (left and right)Two per run, crimped on and sealed.Close each end of a run; crimped on and sealed from the inside.
4 outletsGutter drop outlets (for 2×3 downspouts)One per downspout.The funnel riveted into the gutter bottom where a downspout drops.
8 lengthsAluminum downspout 2×3, 10 ft (2×3 × 10′)4 downspouts × 2: eaves about 10 ft up + about 2 ft for the jog out to the wall.Drains about 600 sq ft of roof each (1 sq in of downspout per 100 sq ft).
12 elbowsDownspout elbows (2×3, A and B)Two at the top to jog the pipe in to the wall, one at the bottom: 3 per downspout.Two at the top jog the downspout in to the wall; one at the bottom turns the water out.
16 strapsDownspout straps (to match)Two per 10 ft length, about every 6–8 ft.Hold the downspout to the wall, about every 6–8 ft.
4 extensionsDownspout extensions (flexible or a splash block)One per downspout, carrying the water 4–6 ft from the foundation.Carry the water 4–6 ft from the foundation (a flexible extension or a splash block).
2 tubesGutter sealant, 10 oz tube (10 oz tubes)About a tube per 6 joints, caps, outlets and corners (12 here), run from the inside.Rubbery sealant for joints, caps and outlets, run from the inside.
1 boxSheet-metal screws (#8 × ½″ zip screws, box of 100)Outlets, connectors, elbows and straps; pop rivets work too.#8 × ½-inch self-drilling “zip” screws for ductwork.

In Canada (25.60 m of gutter, 4 downspouts)

Set to Canada, the Sheet works the job out again for Ontario: metric sizes, bag sizes, the frost depth and the code notes. It doesn't just convert feet to meters. The first lines:

  • 4 lengths, Aluminum K-style gutter, 127 mm: 2 runs of 12.80 m of eaves (25.60 m) in 4.88 m and 3.05 m lengths with the least left over, + 1 spare (one per 4 joints) for mistakes.
  • 3 lengths, Aluminum K-style gutter, 127 mm: The rest of the runs, in 3.05 m lengths, + 1 spare.
  • 4 connectors, Gutter connectors (slip joints): One at each joint between lengths, sealed from the inside.
  • 34 hangers, Hidden gutter hangers with screws: Every 813 mm (UIUC: no more than 813 mm for aluminum) along 25.60 m, + one at each run’s end; screwed into the rafter tails.
  • 4 caps, Gutter end caps: Two per run, crimped on and sealed.
  • 4 outlets, Gutter drop outlets: One per downspout.
Roofing & siding · Sheet S-44 · 02The steps, in order

The steps, in order

  1. Take down the old gutters and downspouts: unscrew or pry out the hangers, lower each run with a helper, and scrap the aluminum.
  2. Inspect the fascia and drip edge; replace soft fascia boards before hanging anything.
  3. Mark the outlets (4 downspouts) and snap a slope line: ¼″ drop per 10 ft toward each outlet; runs over 40 ft slope from the middle to both ends.
  4. Assemble the runs on sawhorses: cut the lengths, join them with connectors, add the end caps and cut in the outlets; seal every joint from the inside.
  5. Hang: a hanger every 32″ screwed through the fascia into the rafter tails, the gutter’s back up under the drip edge, following the slope line.
  6. Downspouts: two elbows out from each outlet to the wall, pipe down, a strap every 6–8 ft, a bottom elbow and an extension that sends the water 4–6 ft from the foundation.
  7. Seal and test: run a hose at the high end of each run; watch for drips at the joints and water standing in the gutter.
Roofing & siding · Sheet S-44 · 03Tools (17)

Tools (17)

Must-have tools first, then the ones that help and the ones to rent for the day.

ToolNeedWhy
8-ft ladder or rolling scaffoldRentEaves about 10 ft up
Extension ladder (24 ft)Good to haveOver shrubs and slopes, with a standoff
Ladder stabilizer (standoff)Good to haveNever lean a ladder on the gutter
Ladder levelerGood to haveSloped ground
Chalk lineMust haveSnaps the slope line on the fascia
4-ft levelMust haveChecks plumb and level over a long span.
Tape measure (25 ft)Must haveThe red boxes every 16″ on the blade are stud spacing.
Cordless drill/driverMust haveWith a ¼″ nut driver for the hanger and zip screws
Aviation snipsMust haveAviation snips: notches, outlet holes, downspouts
HacksawMust haveCuts sections to length
SawhorsesMust haveAssemble the runs on the ground
Rivet gunGood to haveJoints and outlets, instead of screws
Downspout crimperGood to haveCrimps a cut downspout to fit into the next
Caulk gunMust haveGutter sealant
Pry barMust haveThe old hangers and spikes
Cut-resistant glovesMust haveCut aluminum edges are sharp
Safety glassesMust haveEvery cut, every nail, every time.
Roofing & siding · Sheet S-44 · 04Mistakes and how the math works

Mistakes and how the math works

Mistakes that cost a callback or a second trip

  • Hanging the gutter level, or the wrong way: Water stands and rots the fascia. Snap a line: ¼″ drop per 10 ft toward the outlet.
  • Hangers into the fascia only: A full gutter pulls them out. Every hanger finds a rafter tail behind the fascia.
  • Joints sealed on the outside: Water runs under the bead. Seal from the inside, over clean, dry metal.
  • Downspouts dumping at the foundation: It ends up in the basement. An extension or splash block carries it 4–6 ft away.
  • A ladder resting on the gutter: It crushes the gutter and slides. Use a standoff, and keep the ladder 1 out for every 4 up.
  • Outlets where nobody wants water: Over a walk, a driveway or the door. Place outlets where an extension can carry the water away.

What the calculator assumes

  • A gable roof over 40′ × 30′ with 12″ overhangs at 6/12: 1503 sq ft of roof draining to 2 runs of 42 ft of eaves.
  • Size (University of Illinois Small Homes Council): 5″ with downspouts under 30 ft apart, 9/12 or less and up to 30 sq ft of roof per foot of gutter; otherwise 6″. A downspout drains about 100 sq ft of roof per square inch of its opening: a 2×3 about 600 sq ft, a 3×4 about 1,200; one per 30 ft of 5″ gutter at least.
  • Hangers every 32″ (aluminum, UIUC), 24″ where snow and ice stay; slope ¼″ drop per 10 ft (the UIUC allows level, but a little fall drains it dry).
  • Downspouts: eaves about 10 ft up + about 2 ft of jog, in 10 ft lengths; 3 elbows, 2 straps per length and an extension each.
  • Sealant: a tube per about 6 joints, caps, outlets and corners.
Roofing & siding · Sheet S-44 · 05Code, permits and safety

Code, permits and safety

The Sheet sets its code notes for the job's state or province. These are New Jersey's and Ontario's; the code reference has more. Always confirm with your building department.

  • Sizing: the University of Illinois rule: 5″ gutters work while downspouts are under 30 ft apart, the pitch is 9/12 or less and each run drains no more than 30 sq ft of roof per foot of gutter; otherwise 6″. A downspout drains about 100 sq ft of roof per square inch of its opening: a 2×3 about 600 sq ft, a 3×4 about 1,200.
  • Under the drip edge: The gutter’s back goes up under the drip edge, so water off the shingles lands in it. No drip edge? The Roof Sheet counts it; a strip of gutter apron does the job on an old roof.
  • Codes: The IRC (R801.3) asks for a way to carry roof water at least 5 ft from the foundation only where soils are expansive or collapsible; many towns want downspouts kept off the sewer and the neighbor’s lot. Ask your town’s construction office.
  • No permit for gutters in New Jersey: Repairing, replacing or installing exterior gutters and leaders is ordinary maintenance in New Jersey: no permit (N.J.A.C. 5:23-2.7).
  • Usually no permit: Gutters and downspouts usually need no building permit; ask your municipality’s building department where downspouts may drain. Confirm with your building department.
Roofing & siding · Sheet S-44 · 06Questions

Questions

What materials do I need to install gutters and downspouts?

For the worked example, a 84′ of gutter, 4 downspouts, the Sheet counts 12 lines with waste included, starting with aluminum K-style gutter, 5″ (4 lengths), aluminum K-style gutter, 5″ (3 lengths), gutter connectors (slip joints) (4 connectors), hidden gutter hangers with screws (34 hangers). Each line's math is in the table above. Put in your own sizes in the gutters calculator and every line is counted again.

How long does it take to install gutters and downspouts, and can I do it myself?

About 24 to 38 hours for the worked example, in 7 steps. StudSheet stamps it DIY OK: you can do this.

What tools do I need to install gutters and downspouts?

17 in all. The must-haves start with chalk line, 4-ft level, tape measure (25 ft), cordless drill/driver, aviation snips, hacksaw. On the Sheet you mark each one as owned, to buy or to rent.

Roofing & siding · Sheet S-44 · 07Ask about it

Ask about it

Stuck while you install gutters and downspouts? Ask in the Gutters and downspouts group of the StudSheet community with this Sheet attached. Homeowners who've done it and verified pros answer, and anyone can read it.

Roofing & siding · Sheet S-44 · 08More roofing & siding Sheets

More roofing & siding Sheets

  • Roofing, siding and gutters for contractors: run this takeoff at your own prices, send the estimate, and get it signed and the deposit paid.
  • Shingle roof (40′ × 30′ house, 6/12 roof): Squares, bundles, underlayment, ice barrier, drip edge, flashing, vents and nails for an asphalt shingle roof.
  • Install or replace siding (40′ × 25′ house, 2 stories): Squares of vinyl, fiber-cement or engineered-wood lap siding for your house, with house wrap, starter, J-channel, corners, trim and nails — from the same answers as the exterior paint Sheet.
  • All 45 Sheets, across 16 trades.
  • Code reference: frost depths, guard heights, stairs, retaining walls.

Get the Sheet.

Open StudSheet
Coming soon on theApp StoreComing soon onGoogle Play