Sheet S-23 · Patch a hole in drywall
1 patch + 7 small holes
- Patches
- 1plus 7 small holes
- Compound
- 1tub premixed + 1 bag setting-type
- Coats
- 31 setting-type + 2 premixed
- Dry time
- 2–3 daysovernight between coats
Tools you need
- Tape measure (25 ft)
- Carpenter's pencil
- Putty knife
- 6″ taping knife
- Mud pan
- Utility knife + blades
12 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 1 tub | Lightweight spackle8 oz | 6 nail or screw holes and 1 hole up to 2″ (about 10 nail holes’ worth each): one 8 oz tub fills about 140 nail holes, with what stays on the knife. |
| 1 pack of 3 | Self-adhesive wall repair patches, 3-pack6×6″, 3-pack | 1 hole up to 4″: one 6×6″ patch each, at least 1″ bigger than the hole all around; 3 to a pack. |
| 1 bag | Setting-type compound (20–45 min)18 lb bag, 45-minute | The first coat: it hardens in its listed time without shrinking. Mix small batches in a pan. |
| 1 tub | All-purpose joint compound, 1 gal tub | Second and third coats: 1 × 0.05 gal = 0.05 gal. The smallest tub is plenty; it keeps for months closed. |
| 1 quart | Stain-blocking primer, quartstain-blocking | Spot-prime every patch: compound soaks up paint differently and shows through it (flashing). |
| 1 quart | Wall paintmatch the wall and its sheen | Enough for two coats on the patches. The can left over from the last paint job is best; otherwise have a chip color-matched. |
| 1 | 4″ foam mini-roller | A small roller feathers touch-up paint so it blends; a brush leaves marks that show. |
Sheet S-23 · Patch a hole in drywall
1 patch + 7 small holes
- Patches
- 1plus 7 small holes
- Compound
- 1tub premixed + 1 bag setting-type
- Coats
- 31 setting-type + 2 premixed
- Dry time
- 2–3 daysovernight between coats
Tools you need
- Tape measure (7.5 m)
- Carpenter's pencil
- Putty knife
- 150 mm taping knife
- Mud pan
- Utility knife + blades
12 tools on the Sheet, each marked own, buy or rent
| Buy | Item | How we got this |
|---|---|---|
| 1 tub | Lightweight spackle236 mL | 6 nail or screw holes and 1 hole up to 51 mm (about 10 nail holes’ worth each): one 236 mL tub fills about 140 nail holes, with what stays on the knife. |
| 1 pack of 3 | Self-adhesive wall repair patches, 3-pack152×152 mm, 3-pack | 1 hole up to 102 mm: one 152×152 mm patch each, at least 25 mm bigger than the hole all around; 3 to a pack. |
| 1 bag | Setting-type compound (20–45 min)8.2 kg bag, 45-minute | The first coat: it hardens in its listed time without shrinking. Mix small batches in a pan. |
| 1 tub | All-purpose joint compound, 3.8 L tub | Second and third coats: 1 × 0.2 L = 0.2 L. The smallest tub is plenty; it keeps for months closed. |
| 1 × 946 mL | Stain-blocking primer, quartstain-blocking | Spot-prime every patch: compound soaks up paint differently and shows through it (flashing). |
| 1 × 946 mL | Wall paintmatch the wall and its sheen | Enough for two coats on the patches. The can left over from the last paint job is best; otherwise have a chip color-matched. |
| 1 | 100 mm foam mini-roller | A small roller feathers touch-up paint so it blends; a brush leaves marks that show. |