# Whole rooms and whole houses, trade by trade.

> Put as many Sheets on a job as it needs: a basement, an addition, the bathroom’s tile, toilet and vanity. Price your crew’s work and your subs’ quotes from your price book, then run change orders, progress updates, invoices and job cost from the same job.

## The remodeling Sheets

- **[Finish a basement](https://studsheet.com/sheets/basement)**: foam on the walls, framing, insulation for the climate zone, drywall, a drop ceiling and the floor; bedrooms with escape windows, baths drawn with their fixtures, and duct soffits with a headroom check.
- **[Room addition](https://studsheet.com/sheets/addition)**: excavation, foundation, framing, roof, windows, siding, insulation by zone and drywall, with the permits and inspections. The full Sheet is for pros.
- **Kitchens and baths**: the [cabinet painting](https://studsheet.com/sheets/cabinets), [backsplash](https://studsheet.com/sheets/backsplash), [shower tile](https://studsheet.com/sheets/shower), [floor tile](https://studsheet.com/sheets/tile), [vanity](https://studsheet.com/sheets/vanity), [toilet](https://studsheet.com/sheets/toilet) and [caulk](https://studsheet.com/sheets/caulk) Sheets, on the same job.
- **Anything no Sheet covers**: sketch it with every size on it and price it with your own lines.

## From the finish a basement Sheet: 28′ × 25′ basement

28′ × 25′ basement: 657 sq ft finished, 108 studs, 36 sheets of drywall and 188 ceiling panels, with foam on the walls.

| Buy | Item | How StudSheet counts it |
|---|---|---|
| **30 sheets** | Rigid foam board 1″ (R-5) | 848 sq ft of foundation wall (106′ × 8′) + 10% for cuts ÷ 32 sq ft per sheet. |
| **26 tubes** | Foamboard adhesive | 3/16″ beads about 9″ apart (makers say 6–12″) = about 43 ft of bead per 4×8 sheet × 30 sheets + 10%. A 10 oz tube lays about 55 ft of 3/16″ bead. Brace the boards or use cap fasteners until the adhesive cures — follow your adhesive’s label. |
| **238 ft** | Foam board seam tape | A vertical seam every 4 ft + 10%. |
| **4 cans** | Spray foam, gaps and cracks | Corners, pipe holes and the gap at the top of the foam. |
| **4 cans** | Fireblock sealant (fire-rated foam) | Top of the wall cavities where they meet the joists, and around soffits and pipe holes (IRC R302.11) — about 30 ft per can. |

The Sheet has 39 lines like these, each with its math. Change a size and every line follows; on a job, each line takes your price. [The whole worked example](https://studsheet.com/sheets/basement) · [Open the finish a basement calculator](https://app.studsheet.com/p/basement)

## After the signature

- **Change orders** priced line by line, with photos of why, signed before the work.
- **Progress updates** with photos on the client’s job page, sent by text or email in one tap.
- **Job cost**: time on the job, receipts and a job cost report.
- **Invoices** for the deposit, progress and the final, from the signed estimate.

## Questions

### Can I put several Sheets on one remodel estimate?

Yes. Add every Sheet the job needs (framing, drywall, tile, plumbing, paint) and the lines go onto one estimate at your prices. Deposit, progress and final invoices come from it.

### What does the client see?

One link for the job, no app or account: the estimate to sign, change orders to approve, progress updates with photos, what’s been paid and what’s next.